Brick Apartments 7D Woodfield Road London W9 2EF
Variation of condition 8 (operational hours) and details of condition 7 (operational management plan) of planning permission dated 17 February 2021 (RN 20/01986/FULL) for the Variation of condition 1 (approved plans) of planning permission dated 30 April 2019 (RN 18/01481/FULL) which was itself a variation of condition 1 (approved plans) of planning permission dated 01 February 2017 (RN 16/02091/FULL) for the demolition of existing buildings and redevelopment to provide buildings of G+4 and G+13 storeys, providing a mixed use development comprising flexible office use (Class B1) and Healthcare (Class D1), and 74 residential units (including 19 affordable units), with associated basement car parking, cycle parking and hard and soft landscaping from RN 16/02091/FULL to vary drawings to relocate the UKPN Substation from Elmfield Way, to corner the of Elmfield Way and Woodfield Road; Amalgamation of two units (1 x 2 bed, 1 x 1 bed) on the 12th floor of the residential tower, into 3-bedroom unit, 4-bedroom flat on 13th floor changed to a 3-bedroom flat, internal design changes, design details pertaining to condition 28. NAMELY, to vary to infill the existing recessed amenity space on the south elevation of the residential tower (block B) at level 12 and 13 to provide additional internal floor space for the two units located over these levels. NAMELY, to increase the operational hours for health related services to 07.00 and 22.00 Monday to Sunday and to provide details of the operational management plan.
Dev Site At Tot Court Rd Station And 1-23 Oxford St And 157-165 Charing Cross Rd And 1-6 Falconberg Mews London
Variation of conditions 15, 17 of planning permission dated 27th July 2022 (RN 22/01385/FULL) for the following development :Demolition of 17-23 Oxford Street and erection of a building comprising part two basement levels, ground plus eight upper floors with ninth floor roof top plant for use as commercial floorspace at part basement, ground and first floors, offices (Class B1) at part basement, ground and first to eighth floors, new public realm landscaping, servicing and access arrangements. (OSD Site A). NAMELY to allow the ground floor Unit 5 to be used for Class E(b) purposes as well as the previously approved Class E(a) use, to allow the food and beverage company to occupy the unit. And to amend the wording of this condition to allow primary cooking on site within Unit 5, as well as the Units that already benefit from Class E(b) use under permission.
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Removal of condition 15 of planning permission dated 19 July 2022 (RN: 22/02399/FULL) for the: Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works. Namely, to remove the requirement to retain the rounded corners of the existing pavement and kerb layout. (Linked with 23/03678/LBC)
N I O C House 4 - 8 Victoria Street London SW1H 0NE
Variation of condition 1 of planning permission dated 30 May 2022 (RN:22/02156/FULL) for the Variation of condition 1 of planning permission dated 26 May 2021 (RN: 21/01109/FULL) (which varied conditions 1, 6 and 13 and removed conditions 8 and 18 of planning permission dated 11 September 2019 (RN 19/03450/FULL)) for 'Refurbishment and extension of existing building to provide additional B1 (office) floorspace, use of ground floor for retail (Class A1) purposes and Class A3 (cafe/restaurant) purposes and gym (Class D2) at basement level; terraced infilling of central courtyard, creation of roof terraces together with green roofs; reconfiguration and provision of additional plant accommodation at basement and roof level; replacement windows and new entrances together with new shopfronts; new layout at ground level for accessible parking and refuse store; cycle parking and showers and servicing at basement level, to amend the approved drawings to reflect design and technical development changes post planning permission, including alterations to proposed roof plant, removal of green walls and retention and refurbishment of pentagon roof. Namely amendment to layout at floor 8 to extend it and consequential amendment at roof level.
246 Edgware Road London W2 1DS
Variation of condition 4 of planning permission dated 25 November 2022 (RN 21/06493/FULL) for Use of ground and basement floors of 246 as a retail shop (Class E), with hotel fire escape between ground to upper ground floor levels, internal alterations to accommodate a new upper ground floor at 246 and 254 comprising cafe (Class E) and hotel (Class C1) floor space, installation of mechanical plant to the rear of 246, use of basement floor of No.254 as office accommodation (Class E), and use of part of ground floor of 254 as a hotel reception (Class C1) with associated amendment to shop front. NAMELY, To extend the timeframe for the development to be carried out in its entirety as a single phase of works from 18 to 24 months from the date of the decision notice.
45 Foubert's Place London W1F 7QH
Variation of Condition 1 of planning permission dated 5th November 2021 (RN: 20/07701/FULL) for, 'Demolition of the existing fourth floor roof structures and erection of two storey roof extension to create new fourth and fifth floor level (including plant and roof terraces); all to enlarge office building (Class E). Alterations to front (western facade), installation of new windows throughout and associated alterations'; Namely, to make the following amendments to the approved development - internalisation of stair and associated adjustments to roof layout. (Application under Section 73 of the Act).
Fenwicks 53 - 63 New Bond Street London W1S 1RJ
[DEVELOPMENT SITE 5-17 BROOK ST & 53-63 NEW BOND ST] Variation of conditions 6 (evidence of compliance with the council's Code of Construction Practice) and 16 (provision of sustainability and energy efficiency measures) of planning permission dated 17 March 2020 (RN:19/07746/FULL) for 'Extension to the existing retail department store and offices to deliver additional (Class B1) office floorspace with access from Brook Street, change of use of part retail Class A1 floorspace to Class B1 floorspace, new plant on the roof, new roof terraces on Brook Street and New Bond Street frontages, and other associated works' - NAMELY, to allow a phased development (Phase 1 - to carry out works sufficient to implement the permission, and Phase 2 - the remainder of the approved development), to allow the commencement of Phase 1 prior to submitting a detailed construction method statement (condition 6) and to allow phase 1 to commence prior to the remainder of the works within phase 2, and to approve an updated energy statement (condition 16). (S73 application).
St Johns Church Kilburn Lane London W10 4AA
Variation of conditions 1 (and in turn conditions 3, 7, 9, 13, 16, 17, 20) of planning permission dated 21st December 2020 (RN:20/04245/FULL) for the Refurbishment and extension of the Old Vicarage building to convert existing boarding accommodation to provide 5 residential (C3) units; erection of new two storey residential block (plus basement) to the north comprising 4 houses with associated car and cycle parking and landscaping; demolition of sub station and replacement with part single, part two storey school building (Use Class D1) comprising classrooms, ancillary office (Site relates to Bales College). Namely, to add a Phasing Plan to phase the development.
Development Site At 249-259 Regent Street, 257-269 Oxford Street, 1-4 Princes Street And Swallow Place London
DEVELOPMENT SITE INCL. PART 229-247 REGENT ST AND PRINCES ST CARRIAGEWAY: Demolition of 257-269 Oxford Street, 2-6 Swallow Place, 1 Princes Street in their entirety; demolition of 249-259 Regent Street and 7 Swallow Place behind retained facades; and demolition of 2-4 Princes Street behind dismantled and reconstructed facades, to enable the comprehensive redevelopment of the site to provide a single new building comprising basements, ground, part mezzanine and 7 upper floors, for Class A1 retail and Class B1 office use; extensive public realm and highway works including a greater pedestrianised area of Princes Street and the installation of a new kiosk including public toilets on Princes Street; excavation for a basement tunnel link connecting to service bay in 229-247 Regent Street; installation of plant, and associated works. (Linked 18/08271/LBC)
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works.