17 Bruton Street London W1J 6QB
Installation of rooftop telecommunications equipment including three tripods, twelve antennas, four dishes, two GPS modules, three racks, two cabinets and associated ancillary works.
The Plaza 120 Oxford Street London W1D 1LT
Installation of upgrade to existing rooftop telecommunications apparatus and associated ancillary works.
Gerrard Building 32-35 Gerrard Street London W1D 6JA
Installation of proposed additions (of telecommunications equipment) to existing base station at rooftop level.
Lillian Penson Hall 15-25 Talbot Square London W2 1TT
Installation of a telecommunications base station for Telefonica UK Ltd (O2) and Vodafone Ltd, for temporary period of 6 years comprising 6 no. antennas, 3 no. 300mm diameter dish antennas and 1 no. 600mm diameter dish antenna mounted on 3 no. support poles, within a Glass-reinforced plastic (GRP) enclosure, associated 6 no. equipment cabinets sited on a grillage on the centre of the rooftop and ancillary works
The Plaza 120 Oxford Street London W1D 1LT
Installation of telecommunications equipment and associated ancillary works at main roof level.
93 Warrington Crescent London W9 1EH
Increase in height of the existing roof top telecommunications equipment.
144 Praed Street London W2 1HU
The siting of an existing temporary telecommunications base station for 12 months, comprising 6 antennas, 1 300mm diameter dish antenna, 1 200mm diameter dish antenna, mounted on 3 support poles, associated 4 rooftop mounted cabinets and ancillary works.
47 Park Street London W1K 7EB
Installation of telecommunications equipment at roof level including six antenna, one 600mm diameter dish, one 300mm diameter dish, three equipment cabinets and supporting steelwork
Thorndike House 35 Vauxhall Bridge Road London SW1V 2TH
Installation of new door entry systems, fob-access pedestrian security access gates, overhaul of telecoms cabling to Thorndike House and Longleat House.
Royal United Services Institute For Defence Studies Whitehall London SW1A 2ET
The re-installation of 7.5m high flagpole telecommunications antenna, one 0.3m satellite dish (following their temporary removal), plus the repositioning of two equipment cabinets at fifth floor level and a wall mounted distribution board; also the re-positioning of three mast head amplifiers mounted onto a new cable tray at roof level.