Trafalgar Buildings 1-3 Whitehall London SW1A 2DD
Demolition of existing shopfront and construction of a new shopfront (as approved by planning permission dated 14th October 2020 (RN: 20/03725/FULL)).
27 Knightsbridge London SW1X 7YB
Offices (Class E) converted to hotel (Class C1) use, demolition of basement accommodation and construction of hotel staff changing facilities including fire escapes, thermal constructive walls, suspended ceilings, air conditioning, lighting, power supply, drainage, installation of toilets, sinks and showers.
Development Site At St Albans, Greener House, Samuel House Haymarket, 13-16 Charles II St Haymarket London
Demolition of 2.5 metres by 2.5 metres of slab at first floor level of Samuel House (Confirming lawful implementation of planning permission dated 10 January 2023 (ref. 22/03961/FULL): Variation of conditions 3, 4, 5, 6, 7, 39, 40 and 52 dated 24 June 2020 (RN:19/04480/FULL) for "complete demolition of St Albans House and Samuel House and demolition behind remodelled facades of Greener House and 13-16 Charles II Street to enable the comprehensive redevelopment of the site to provide a single new building comprising basements, ground and mezzanine floors and 7 upper floors, retained and remodelled facades at Greener House and 13-16 Charles II Street for use for Class A1 and/or A3 and/or A4, Class D2 and Class B1 office. Basement tunnel link to 11-12 Charles II Street, associated public realm and highway works and other associated works. Alterations to the facade of the Carlton Cinema"; NAMLEY, to allow a 'phased development' (Phase 1 - to remove an internal floor slab in Samuel House and cleaning of the cinema facade and Phase 2 - the remainder of the approved development), to allow the commencement of phase 1 prior to submitting detailed design and construction method statements (condition 3), completed Appendix A (condition 4), additional CoCP requirements (condition 5), written scheme of investigation (condition 6), detail design and method statements in consultation with TfL (condition 7), site investigation (condition 39), fire strategy for the cinema (condition 40), and written scheme of historic building investigation (condition 52) and to allow phase 1 to commence prior to the remainder of the works within phase 2).
Development Site At 127-143 Oxford Street, 53-55 Berwick Street And 201-205 Wardour Street London
Confirmation of permission granted on 21 January 2020 (Ref: 19/05171/FULL) has commenced and been lawfully implemented, on the basis that construction works began through the construction of a service connection for the purpose of a drainage outfall in the basement of 199 Wardour Street linking into the Thames Water network.
6 Blenheim Terrace London NW8 0EB
Construction of hard standing (reinforced concrete) over existing basement lightwell to create additional habitable space within basement level.
Luxborough Towers Luxborough Street London W1U 5BW
Confirmation of the lawful implementation of planning permission dated 19th November 2020 (RN: 19/06451/COFUL) for the: Redevelopment of existing play space to provide a new building comprising a flexible Class D1 (non-residential institutions) use at ground floor level, 14 x affordable house units (7 x 1-bed and 7 x 2-bed) on first to fifth floors with associated terraces/balconies (Class C3); associated access and other works including a subterranean rainwater harvesting tank; new plant, cycle parking, refuse storage and landscaping. Removal of existing boundary railings and brick wall base adjoining Paddington Street Gardens North and construction of new boundary wall. (COUNCIL'S OWN DEVELOPMENT).
16 Montpelier Mews London SW7 1HB
Partial demolition and associated works to wall, entrance, store and plant areas. (Confirming lawful implementation of planning permission dated 3rd January 2019 (RN: 18/05866/FULL) for the: "Demolition of existing buildings and construction of a four storey building with basement to provide eight residential units (3 x 1-bedroom, 3 x 2-bedroom and 2 x 3-bedroom) (Class C3). Provision of air-conditioning units on the first floor external roof of the proposed building. [Site includes 16-19 Montpelier Mews])
1 Hall Gate London NW8 9PG
Construction of a rear dormer extension.
41 Kingsway London WC2B 6TP
Development undertaken at 41 Kingsway between 17th May 2021 and 26th May 2021 namely; construction of an entrance ramp.
Basement Rear 123 - 125 Gloucester Place London W1U 6JZ