9 Chesterfield Street London W1J 5JJ
Confirmation that the proposed works undertaken are sufficient to constitute implementation of the planning permission dated 9 December 2014 (ref: 14/09658/FULL) for; "Excavation of sub-basement beneath building, part demolition and erection of replacement roof structure and rooflight, installation of plant at main roof level, external alterations to the property including at rear lower ground and ground floor levels. Use of extended building as a dwellinghouse (Class C3)."
Development Site At St Albans, Greener House, Samuel House Haymarket, 13-16 Charles II St Haymarket London
Demolition of 2.5 metres by 2.5 metres of slab at first floor level of Samuel House (Confirming lawful implementation of planning permission dated 10 January 2023 (ref. 22/03961/FULL): Variation of conditions 3, 4, 5, 6, 7, 39, 40 and 52 dated 24 June 2020 (RN:19/04480/FULL) for "complete demolition of St Albans House and Samuel House and demolition behind remodelled facades of Greener House and 13-16 Charles II Street to enable the comprehensive redevelopment of the site to provide a single new building comprising basements, ground and mezzanine floors and 7 upper floors, retained and remodelled facades at Greener House and 13-16 Charles II Street for use for Class A1 and/or A3 and/or A4, Class D2 and Class B1 office. Basement tunnel link to 11-12 Charles II Street, associated public realm and highway works and other associated works. Alterations to the facade of the Carlton Cinema"; NAMLEY, to allow a 'phased development' (Phase 1 - to remove an internal floor slab in Samuel House and cleaning of the cinema facade and Phase 2 - the remainder of the approved development), to allow the commencement of phase 1 prior to submitting detailed design and construction method statements (condition 3), completed Appendix A (condition 4), additional CoCP requirements (condition 5), written scheme of investigation (condition 6), detail design and method statements in consultation with TfL (condition 7), site investigation (condition 39), fire strategy for the cinema (condition 40), and written scheme of historic building investigation (condition 52) and to allow phase 1 to commence prior to the remainder of the works within phase 2).
Haymarket House 28-29 Haymarket London SW1Y 4SP
Confirmation that demolition works to the roof top plant enclosure constitute a material operation which has lawfully implemented the planning permission dated 8th July 2020 (19/10051/FULL) for the use of the basement, part ground and first to seventh floor levels as a hotel (Use Class C1) including ancillary restaurant /café and bar. Installation of new mechanical plant and reconfiguration of existing plant within acoustic enclosures at roof level and provision of a brown roof. Installation of a new riser within the existing south-east lightwell. Alterations to the Haymarket entrance and frontage and alterations to the ground floor elevation on Oxendon Street.
Broadway Complex 55 Broadway London SW1H 0BD
Confirmation that the demolition of the pergola structure and supporting adjoining stonework chimneys at Level 10 on the West Wing of 55 Broadway constitute a material operation which has lawfully implemented planning permission dated 23 December 2020 (19/09813/FULL) for: Conversion of buildings for use as hotel (Class C1) with ancillary flexible retail, leisure/spa, restaurant or bar use and other associated facilities; use of 10th floor roof terraces; internal and external alterations including creation of new service bay off St Ermin's Hill, reconfiguration of entrances/exits to St James's Park Underground Station and rooftop plant.
8 Elm Tree Road London NW8 9JX
Confirmation that planning permission (ref. 15/04516/FULL) for the: "Demolition of garage, front portico and front steps, part demolition of side extension, extension of two-storey side wing at first floor level, alterations to facade and fenestration on front, rear and both side elevations, alterations to front garden and boundary wall including car park lift, excavation of basement incorporating swimming pool and associated plant underneath garden, front and rear lightwells and air extract in rear garden" had been lawfully implemented before 15 March 2019.
23 Hamilton Terrace London NW8 9RE
Confirmation that the application referenced 19/05543/FULL dated 10.09.2019 for "Excavation of new basement (part 2, part 1 storey) beneath rear garden, demolition of existing rear lower ground floor conservatory and erection of rear lower ground floor extension. Erection of ground floor side/rear extension and external spiral staircase. Installation of ventilation plant. Internal alterations." has been lawfully implemented.
8-10 Great George Street London SW1P 3AE
Confirmation that the demolition of roof top plant and enclosures constitutes a material operation to lawfully implement planning permission dated 8 November 2019 (RN:19/02730/FULL) for: Use of part ground and upper floors as a 134-room hotel (Class C1); use of part lower ground as a leisure suite (Class D2); use of ground floor as restaurant/bar (Class A3/A4), external alterations, including demolition to include the removal of the rooftop plant enclosures and replacement with a single storey extension, remodelling of the Little Sanctuary elevation and introduction of balconies and lightwells.
20 Montpelier Mews London SW7 1HB
Confirmation that works comprising excavation of a trench and formation of a concrete ground beam to support foundations, constituted a material operation and lawfully implemented planning permission dated 26 September 2019 (RN:19/00810/FULL) for the 'Part demolition of front and rear facades and removal of existing third floor, alteration and refurbishment of front and rear facades including rear extensions at lower ground floor level, erection of new third floor level, erection of additional storey to create a new 4th floor level with roof terrace and mechanical plant, and use of extended building as 10 flats (Class C3). Provision of cycle storage and bin store'.
101 Ilbert Street London W10 4QF
Partial demolition of rear extension. Alteration of roofline of remaining extension. Installation of double french doors to rear and window to side.
60 Marlborough Place London NW8 0PL
Confirmation of the lawful implementation of planning permission dated 6 June 2017 (RN: 17/01932/FULL) for the: Excavation of basement with associated lightwells and mechanical plant, demolition and replacement of existing side extension and alterations to dormers at roof level and fenestration/doors to elevations, associated works to front and rear gardens.