Trafalgar Buildings 1-3 Whitehall London SW1A 2DD
Demolition of existing shopfront and construction of a new shopfront (as approved by planning permission dated 14th October 2020 (RN: 20/03725/FULL)).
27 Knightsbridge London SW1X 7YB
Offices (Class E) converted to hotel (Class C1) use, demolition of basement accommodation and construction of hotel staff changing facilities including fire escapes, thermal constructive walls, suspended ceilings, air conditioning, lighting, power supply, drainage, installation of toilets, sinks and showers.
Development Site At St Albans, Greener House, Samuel House Haymarket, 13-16 Charles II St Haymarket London
Demolition of 2.5 metres by 2.5 metres of slab at first floor level of Samuel House (Confirming lawful implementation of planning permission dated 10 January 2023 (ref. 22/03961/FULL): Variation of conditions 3, 4, 5, 6, 7, 39, 40 and 52 dated 24 June 2020 (RN:19/04480/FULL) for "complete demolition of St Albans House and Samuel House and demolition behind remodelled facades of Greener House and 13-16 Charles II Street to enable the comprehensive redevelopment of the site to provide a single new building comprising basements, ground and mezzanine floors and 7 upper floors, retained and remodelled facades at Greener House and 13-16 Charles II Street for use for Class A1 and/or A3 and/or A4, Class D2 and Class B1 office. Basement tunnel link to 11-12 Charles II Street, associated public realm and highway works and other associated works. Alterations to the facade of the Carlton Cinema"; NAMLEY, to allow a 'phased development' (Phase 1 - to remove an internal floor slab in Samuel House and cleaning of the cinema facade and Phase 2 - the remainder of the approved development), to allow the commencement of phase 1 prior to submitting detailed design and construction method statements (condition 3), completed Appendix A (condition 4), additional CoCP requirements (condition 5), written scheme of investigation (condition 6), detail design and method statements in consultation with TfL (condition 7), site investigation (condition 39), fire strategy for the cinema (condition 40), and written scheme of historic building investigation (condition 52) and to allow phase 1 to commence prior to the remainder of the works within phase 2).
16 Montpelier Mews London SW7 1HB
Partial demolition and associated works to wall, entrance, store and plant areas. (Confirming lawful implementation of planning permission dated 3rd January 2019 (RN: 18/05866/FULL) for the: "Demolition of existing buildings and construction of a four storey building with basement to provide eight residential units (3 x 1-bedroom, 3 x 2-bedroom and 2 x 3-bedroom) (Class C3). Provision of air-conditioning units on the first floor external roof of the proposed building. [Site includes 16-19 Montpelier Mews])
Sentinel House 193 - 197 Old Marylebone Road London NW1 5QP
Confirmation that planning permission reference 19/00985/FULL granted on 13 November 2019 for the "Variation of Conditions 1 and 29 and Removal of Conditions 9, 11, 27 of the planning permission dated 2 April 2015 (14/08069/FULL) for demolition of existing office building and construction of 9 storey residential building comprising 41 residential units, landscaping along Old Marylebone Road and associated works" has been lawfully implemented.