26 Jay Mews London SW7 2ER
Remodelling of the interior of the existing building, creation of new entrance and alterations to the Bremner Road elevation and replacement mews boundary gate in connection with use of the building as a church.
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Removal of condition 9 of listed building consent dated 19 July 2022 (RN: 22/02400/LBC) for the: Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works. Namely, to remove the requirement to retain the rounded corners of the existing pavement and kerb layout. (Linked with 23/03655/FULL)
2-6 Stanhope Row; 16 Stanhope Row 36 And 37 Hertford Street 16a, 16B And 17 Market Mews
Internal and external alterations to 36 Hertford Street including demolition and remodelling of existing mansard roof, with new roof level plant enclosure. (Linked with 22/05759/FULL)
Pegasus House 37-43 Sackville Street London W1S 3EH
Redevelopment of Pegasus House and Nuffield House including demolition behind a retained facade (west, south and east) of Nuffield House and replacement building comprising 2 level basement, ground, mezzanine and first to seventh floor and demolition and replacement of Pegasus House comprising 2 level basement, ground, mezzanine and first to fifth floors and other associated works already approved under application RN 20/07676/LBC additional works include retention of angled wall at roof level of Pegasus House and remodelling of roof above stair well.
Curzon House 21 - 23 Curzon Street London W1J 7TE
Replacement of external rear access door and third floor internal remodelling.
The National Gallery Trafalgar Square London WC2N 5DN
External and internal alterations, including remodelling of external gates, replacement glazing and adaption of the loggia and internal lobby to the Sainsbury Wing. Alterations to the southwest part of the Wilkins Building, including existing railings, lawn and wall; with new entrance onto Trafalgar Square to the Research Centre and Members Room, with related internal alterations. New basement link under Jubilee Walk; and alterations to the Pigott Education Centre, including new external window on the facade.
23 Craven Hill London W2 3EN
Remodel the rear garden landscaping and relocate the approved staircase and including enclosure of gate in boundary wall. (Linked with 22/05925/FULL)
Flat 40 2 Mansfield Street London W1G 9NF
Alterations including remodelling and reconstructing internal walls, replacement of external sliding doors, refitting existing window frames with slimline double glazing, and mounting an air source heat pump at roof level and a hot water cylinder on the terrace.
39 Eaton Place London SW1X 8BX
Internal and external alterations, including removal of modern fixtures and fittings and reinstatement of lost historic fabric, reconfiguration and replacement of modern circulation elements, some minor alterations to modernised plan form and replacement services. Remodelling of fourth floor mansard, replacement of modern skylights at ground. Removal of access ladder on the front of the mansard and railings on the party wall with 37. Continuation of internal staircase to provide maintenance access to the roof vis a new sliding access hatch skylight. Replacement timber doors to the house at ground and at basement level and to the vaults; reinstatement of Portland stone to the entrance steps, external entrance and vault doors to ground and lower ground. (Linked to 21/06872/FULL)
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works.