1 Montpelier Square London SW7 1JT
Excavation of a new basement, extension at rear lower ground to first floor levels with mechanical plant and enclosure to the roof of the new extension and installation of double glazed windows. Internal alterations including replacement of lift and dumb waiter within their existing shafts, replacement of window sashes with double glazing and repairs to the roof.
Flat 10 1 Carlos Place London W1K 3AJ
Replacement of both apartment entrance doors; refurbishment front windows; refurbishment of rear windows including replacement of glazing with new single pane glazing; replacement of the roof level condenser unit; and internal alterations. (Linked with 23/06919/FULL)
57A Tufton Street London SW1P 3QL
Internal alterations including replacement kitchen, wc, two bathrooms, addition of partition on the second floor, rearrange partitions on the third floor, replacement of the flat roof cover to include thermal insulation, and metal balustrade.
12 Chesterfield Street London W1J 5JN
Internal alterations including reconstruction of staircases, removal and replacement of partitions and other internal works, and installation of rooflights to rear flat roof, external works to paving, works to chimney stack, and external railings
72 - 74 Lancaster Gate London W2 3NH
Internal and external alterations including excavations of extended basement floor, erection of replacement rear extensions, formation of roof terraces, replacement of mansard roof extension and installation of mechanical plant at roof level to No.73, alteration and replacement of external railings and new windows and doors, new floor finishes, and internal alterations to all floors. (Linked to 23/00770/FULL)
29 Molyneux Street London W1H 5HW
Replacement rear lower ground floor door with of timber bi-folding doors, retention of rear garden planter and external repairs to the front hard surfacing, rear roof terrace and roof; installation of walk on glazed floor at ground floor; layout alterations; installation of doors, architraves and skirting boards and the repair of the front door; and associated works (partially retrospective). [Linked to 23/04032/FULL]
45 Reeves Mews London W1K 2EH
Erection of a mansard roof extension to enlarge dwellinghouse (Class C3) and associated alterations to internal layout.
Flat 3, 9 - 12 Park Crescent London W1B 1PG London W1B 1PG
Installation of one air conditioning unit at roof level. Internal alterations to Flat 3 at third floor level (Linked with 23/06657/FULL)
56 Queen Anne Street London W1G 8LA
Installation of a passenger lift and a new spiral stone stair in the location of the existing redundant secondary staircase; demolition and redevelopment of late 19th century rear addition; courtyard extension to the north side of the property, with Marylebone Mews frontage and use as a member's club (sui generis); alteration of roof-escape to accommodate plant behind a new pitched roof; addition of a replacement stair from second to third floor, following the demolition of late 19th century additions at these levels; and internal alteration and refurbishment, including the upgrading and re-routing of services. (Linked with 23/05228/FULL)
7 Albion Street London W2 2AS
Demolition of existing lower ground rear extension and second floor closet wing extension; Erection of new two storey extension in rear courtyard and replacement second floor closet wing extension; New external stair to front lightwell; Alterations to the existing rear closet wing; Replacement roof and dormers; Remedial structural and maintenance works. Internal alterations, including to partitions.