Open Space At Trafalgar Square London WC2N 5DS
Installation of new drainage channel to the bottom of the steps from Trafalgar Square to the National Gallery to the male and female public toilets and security office built into the retaining wall.
Hill House 1 Little New Street City Of London London EC4A 3JR
Demolition of existing building above ground with retention of existing basement and piles/foundations and erection of a mixed use office building comprising two basement levels, lower ground, upper ground and upper ground mezzanine plus 18 upper storeys for the provision of office space (Use Class E), gym/auditorium (Use Class E), flexible office, café/retail (Use Class E), reprovision of existing library (Use Class F1), flexible library/office (Use Class F1/E) and restaurant (Use Class E), discontinuance of the City Walkway, enhanced and enlarged public realm, hard and soft landscaping, highway works, and associated enabling works.
STREET RECORD Puddle Dock City Of London London
EIA Scoping Opinion request under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site known as Puddle Dock. The proposal involves highways works which will divide the development in three Zones (A, B and C Zones). The Zones comprise a mix of office and retail floorspace (Use Class E) up to approximately 114,160 sqm GEA and culture offer, distributed across eight blocks/buildings. The development would replace existing accommodation for the City of London School for Boys and associated rooftop MUGA and provide new public realm and roof garden/terraces.
High Holborn London Borough Of Camden London
Redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.
99 Bishopsgate City Of London London EC2M 3XD
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the site known as 99 Bishopsgate. The proposed development comprises demolition of the existing buildings and erection of a new tower (240.5m AOD, 54 storeys excl. basement) and satellite buildings for office (Class E) (circa 97,000sq.m NIA), culture/community, retail and food and beverage uses (Class E) (circa 2000sq.m NIA); 3 basement levels, servicing access, and the provision of new public realm and landscaping and other associated works. (CoL RN 23/01122/SCOP)
The Queen's Walk London London Borough Of Lambeth
Approval of details pursuant to condition 1 (permanent retention of the London Eye) of planning permission ref. 01/03315/FULL. Retention of London Eye support infrastructure including modified pre- boarding area (removable queue barriers), tension base glass screen with minor alterations, existing CCTV and proposed new CCTV cameras, existing radio mast and existing underground electricity substation. Change of use of ground, basement and sub basement floors of County Hall to provide London Eye ancillary and support services including expanded public toilets, exhibition and display areas, hospitality, offices, storage areas and circulation areas. Revised steps and ramp arrangements to County Hall bridge.), granted on 12.03.2002.
Land At 18 Blackfriars Road And 1-7 Stamford Street Together With Land At 18 Blackfriars Road Bounded By Stamford Street Paris Garden And Christ Church, London, SE1
Part demolition to the rear of 1 and 3 - 7 Stamford Street together with: the erection of a ground plus three-storey podium comprising retail, leisure, office, education, gallery, library and assembly room uses; two levels of basement for servicing, plant, car and cycle parking plus pit access within a partial basement at level three; two residential buildings of 22 and 40 storeys above podium; an office building of 45 storeys above podium; improvements to the existing public house; landscaping at ground and podium levels; replacement boundary at the southern edge of the Site; plant and all other associated, enabling and ancillary works.
1 Undershaft City Of London London EC3A 8EE
EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the: Demolition of the existing building and the construction of a ground plus 74 storey building for office use (Class E, up to approximately 109,980m²), retail, and food and beverage facilities (Use Class E, up to approximately 2,590m²) viewing gallery and education spaces (up to approximately 2,450m²). Plus, the provision of a new servicing access and public realm and highways alterations including the provision of raised publicly accessible podium at level 10. | 1 Undershaft London EC3A 8EE.
40 Holborn Viaduct City Of London London EC1N 2PB
Refurbishment and extension of the existing office building to include an additional three storeys; replacement of the facades; creation of terraces and balconies on the south and west elevations; retail at ground and lower ground levels; and all plant, disabled parking, cycle parking and associated works including landscaping of the external area on Holborn Circus.
Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical Center(Class E (e), in new buildings ranging from 6-15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).