73 Gloucester Terrace London W2 3DH
Internal alterations to basement, replacement of windows and doors to front and rear elevation (Part retrospective) (Linked to 23/01073/LBC)
11 - 13 Charlotte Street London W1T 1RH
Internal alterations including the removal of partitions between the front and rear rooms and new partitions to the front room (part retrospective)
30 - 32 Inverness Terrace London W2 3JA
Installation of air conditioning units to rear and side elevations, rear railings and walkways for fire safety, alterations to tiling at the rear, replacement of uPVC windows with timber windows (part retrospective). ( Linked with 23/01130/LBC).
Second Floor 77 Dean Street London W1D 3SH
Installation of metal railings to the rear second floor terrace and internal alterations at second floor level. (Part Retrospective).
Second Floor 77 Dean Street London W1D 3SH
Installation of metal railings to the rear second floor terrace and internal alterations at second floor level. (Part Retrospective).
Basement To First Floor Rear Bourne House 13 - 15 Westbourne Grove London W2 4UA
Shopfront alterations, and the use of the first floor balcony as residential amenity space at 38-39 Redan Place (the rear facade of 13-15 Westbourne Grove). (Retrospective)
59-63 Queensway London W2 4QH
Alterations to the shopfront including replacement door. (Retrospective) (Former Kam Tong Restaurant, 59-63 Queensway)
Flat 14 46 Queen's Gardens Bayswater London W2 3AA
Internal alterations to flat at 4th/5th floor levels including reconfiguration of the flat including removal of internal dividing walls and installation of new stud walls; redecoration of all rooms, including repainting and installation of new flooring; replacement of wooden bannisters and railing on the staircase with a glass balustrade; and replacement of internal doors. (Retrospective)
31 Craven Street London WC2N 5NP
Internal alterations including installation of bathroom at lower basement bedroom level. (Retrospective).
103B Lisson Grove London NW1 6UP
Rear window replacement, new flat rooflight to the roof access, pipework alterations and internal works at second floor level (part retrospective).