17 Belgrave Square London SW1X 8PG
Demolition of annexe building and replacement with rear extensions to 17 Belgrave Square and excavations to create pool hall extension under garden of 17 Belgrave Square and basement beneath mews property; all in connection with the use of the mews property and 17 Belgrave Square as two single family dwelling houses. (Confirmation it is lawful to continue with the development allowed by planning permission dated 13 December 2019 RN: 18/01324/FULL).
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
45 Foubert's Place London W1F 7QH
Variation of Condition 1 of planning permission dated 5th November 2021 (RN: 20/07701/FULL) for, 'Demolition of the existing fourth floor roof structures and erection of two storey roof extension to create new fourth and fifth floor level (including plant and roof terraces); all to enlarge office building (Class E). Alterations to front (western facade), installation of new windows throughout and associated alterations'; Namely, to make the following amendments to the approved development - internalisation of stair and associated adjustments to roof layout. (Application under Section 73 of the Act).
9 Moncorvo Close London SW7 1NQ
Application for prior approval under Schedule 2, Part 1, Class AA of The Town And Country Planning (General Permitted Development) Order 2015 (as amended) for the erection of a two-storey roof-level extension to add two additional floors to a terraced block of four storey residential dwellings.
10 Moncorvo Close London SW7 1NQ
Application for prior approval under Schedule 2, Part 1, Class AA of The Town And Country Planning (General Permitted Development) Order 2015 (as amended) for the erection of a two-storey roof-level extension to add two additional floors to a terraced block of four storey residential dwellings.
6 Moncorvo Close London SW7 1NQ
Application for prior approval under Schedule 2, Part 1, Class AA of The Town And Country Planning (General Permitted Development) Order 2015 (as amended) for the erection of a two-storey roof-level extension to add two additional floors to a terraced block of four storey residential dwellings.
8 Moncorvo Close London SW7 1NQ
Application for prior approval under Schedule 2, Part 1, Class AA of The Town And Country Planning (General Permitted Development) Order 2015 (as amended) for the erection of a two-storey roof-level extension to add two additional floors to a terraced block of four storey residential dwellings.
7 Moncorvo Close London SW7 1NQ
Application for prior approval under Schedule 2, Part 1, Class AA of The Town And Country Planning (General Permitted Development) Order 2015 (as amended) for the erection of a two-storey roof-level extension to add two additional floors to a terraced block of four storey residential dwellings.
Fenwicks 53 - 63 New Bond Street London W1S 1RJ
[DEVELOPMENT SITE 5-17 BROOK ST & 53-63 NEW BOND ST] Variation of conditions 6 (evidence of compliance with the council's Code of Construction Practice) and 16 (provision of sustainability and energy efficiency measures) of planning permission dated 17 March 2020 (RN:19/07746/FULL) for 'Extension to the existing retail department store and offices to deliver additional (Class B1) office floorspace with access from Brook Street, change of use of part retail Class A1 floorspace to Class B1 floorspace, new plant on the roof, new roof terraces on Brook Street and New Bond Street frontages, and other associated works' - NAMELY, to allow a phased development (Phase 1 - to carry out works sufficient to implement the permission, and Phase 2 - the remainder of the approved development), to allow the commencement of Phase 1 prior to submitting a detailed construction method statement (condition 6) and to allow phase 1 to commence prior to the remainder of the works within phase 2, and to approve an updated energy statement (condition 16). (S73 application).
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 5th January 2023 (RN:22/03790/FULL) for Variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 15 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY the removal of the loggia/covered walkway area between Blocks G and H, the re-design of the layout of the restaurant at the ground floor of Block H and design changes to the façade/elevation of the restaurant extension.