30 - 31 Golden Square London W1F 9LD
Amendments to planning permission dated 05 October 2023 (RN: 23/04630/FULL) for variation of Conditions 1 and 3 of planning permission dated 15 May 2023 (RN: 23/01735/FULL) for, 'alterations including partial infilling of rear courtyard on basement and ground floors, rear extensions on first to fifth floors and at sixth floor roof extension with plant enclosure, roof terrace and green roof above all to provide additional office accommodation (Class B1); new balconies/terraces at front fourth, fifth and seventh floor levels and rear first, sixth and seventh floor levels. Flexible use of part basement and part ground floor for either retail / office/ gym use (Class A1/ B1/ D2), provision of cycle parking and associated external alterations'; namely, to install privacy screens on the first-floor terrace, and to amend the wording of Condition 3 to enable the installation of the privacy screens. (Application under Section 73 of the Act). NAMELY; provision of condenser and handrail at fourth floor terrace.
St Johns Church Kilburn Lane London W10 4AA
Amendments to planning permission dated 23rd November 2022 (RN:22/06087/FULL) for Variation of conditions 1 (and in turn conditions 3, 7, 9, 13, 16, 17, 20) of planning permission dated 21st December 2020 (RN:20/04245/FULL) for the Refurbishment and extension of the Old Vicarage building to convert existing boarding accommodation to provide 5 residential (C3) units; erection of new two storey residential block (plus basement) to the north comprising 4 houses with associated car and cycle parking and landscaping; demolition of sub station and replacement with part single, part two storey school building (Use Class D1) comprising classrooms, ancillary office (Site relates to Bales College). Namely, to amend wording in Condition 11.
30 - 31 Golden Square London W1F 9LD
Variation of Conditions 1 and 3 of planning permission dated 15 May 2023 (RN: 23/01735/FULL) for, 'Alterations including partial infilling of rear courtyard on basement and ground floors, rear extensions on first to fifth floors and at sixth floor roof extension with plant enclosure, roof terrace and green roof above all to provide additional office accommodation (Class B1); new balconies/terraces at front fourth, fifth and seventh floor levels and rear first, sixth and seventh floor levels. Flexible use of part basement and part ground floor for either retail / office/ gym use (Class A1/ B1/ D2), provision of cycle parking and associated external alterations'; NAMELY, to install privacy screens on the first floor terrace, and to amend the wording of Condition 3 to enable the installation of the privacy screens. (Application under Section 73 of the Act).
Development At 112-130 Edgware Road, 136-138 George Street And 24 Nutford Place London W1H 5YQ
Variation of Conditions 19, 20, 21 and 31 of planning permission dated 22 May 2015 (RN:14/07461/FULL) of demolition of existing buildings comprising street block bounded by Edgware Road, George Street, Forset Street and Nutford Place and redevelopment by erection of a part eight, part nine storey building with roof level plant room, two storey basement containing car parking, cycle storage and other ancillary floorspace to provide up to 24 residential units (Class C3), offices (Class B1) and retail (Class A1) accommodation. Associated external works and landscaping. NAMELY, proposal seeks to amend the wording of conditions 19, 20, 21 and 31.
N I O C House 4 - 8 Victoria Street London SW1H 0NE
Variation of condition 1 of planning permission dated 30 May 2022 (RN:22/02156/FULL) for the Variation of condition 1 of planning permission dated 26 May 2021 (RN: 21/01109/FULL) (which varied conditions 1, 6 and 13 and removed conditions 8 and 18 of planning permission dated 11 September 2019 (RN 19/03450/FULL)) for 'Refurbishment and extension of existing building to provide additional B1 (office) floorspace, use of ground floor for retail (Class A1) purposes and Class A3 (cafe/restaurant) purposes and gym (Class D2) at basement level; terraced infilling of central courtyard, creation of roof terraces together with green roofs; reconfiguration and provision of additional plant accommodation at basement and roof level; replacement windows and new entrances together with new shopfronts; new layout at ground level for accessible parking and refuse store; cycle parking and showers and servicing at basement level, to amend the approved drawings to reflect design and technical development changes post planning permission, including alterations to proposed roof plant, removal of green walls and retention and refurbishment of pentagon roof. Namely amendment to layout at floor 8 to extend it and consequential amendment at roof level.
246 Edgware Road London W2 1DS
Variation of condition 4 of planning permission dated 25 November 2022 (RN 21/06493/FULL) for Use of ground and basement floors of 246 as a retail shop (Class E), with hotel fire escape between ground to upper ground floor levels, internal alterations to accommodate a new upper ground floor at 246 and 254 comprising cafe (Class E) and hotel (Class C1) floor space, installation of mechanical plant to the rear of 246, use of basement floor of No.254 as office accommodation (Class E), and use of part of ground floor of 254 as a hotel reception (Class C1) with associated amendment to shop front. NAMELY, To extend the timeframe for the development to be carried out in its entirety as a single phase of works from 18 to 24 months from the date of the decision notice.
N I O C House 4 - 8 Victoria Street London SW1H 0NE
Variation of condition 1 of planning permission dated 26 May 2021 (RN: 21/01109/FULL) (which varied conditions 1, 6 and 13 and removed conditions 8 and 18 of planning permission dated 11 September 2019 (RN 19/03450/FULL)) for 'Refurbishment and extension of existing building to provide additional B1 (office) floorspace, use of ground floor for retail (Class A1) purposes and Class A3 (cafe/restaurant) purposes and gym (Class D2) at basement level; terraced infilling of central courtyard, creation of roof terraces together with green roofs; reconfiguration and provision of additional plant accommodation at basement and roof level; replacement windows and new entrances together with new shopfronts; new layout at ground level for accessible parking and refuse store; cycle parking and showers and servicing at basement level, to amend the approved drawings to reflect design and technical development changes post planning permission, including alterations to proposed roof plant, removal of green walls and retention and refurbishment of pentagon roof. NAMLEY, to allow amendments to the design of the windows at Level 8 of the Pentagon.
Dacre House 19 Dacre Street London SW1H 0DJ
Amendments to planning permission dated 13 January 2022 (21/05212/FULL) for Variation of Conditions 1 and 19 of planning permission dated 12 October 2017 (RN: 17/01327/FULL) for the 'Erection of a two storey roof extension and infill extension at rear ground to fifth floor levels to provide additional office accommodation (Class B1). Use of the basement and ground floor levels to provide retail (Class A1) and restaurant (Class A3) uses. Complete facade refurbishment to all elevations. Provision of terraces at rear second to seventh floor levels. Installation of mechanical plant and lift overrun within an enclosure at roof level namely, to amend the wording of Conditions 5 and 18 to remove reference to 'you must not start work' and replace this wording with 'you must not start any work on these parts of the development'.
Chimes Apartments 99 - 105 Horseferry Road London SW1P 2DX
Amendments to permission dated 28 July 2021 (RN: 20/05512/FULL) (which varied permissions dated 1 May 2019 RN: 18/09619/FULL, 1 February 2019 RN:18/00506/FULL and 29 April 2016 RN: 15/11404/FULL) for variation of conditions 1, 14 and 17 of permission dated 1 May 2019 (RN: 18/09619/FULL) (which varied permissions dated 1 February 2019 RN:18/00506/FULL and 29 April 2016 RN: 15/11404/FULL) for 'Demolition and redevelopment of the site to provide a residential complex comprising 39 units of self-contained assisted living accommodation integrated with facilities including communal kitchen-cafe, storage areas, wellness centre/spa, guest accommodation, staff accommodation, staff offices, in two linked buildings of six storeys each, internal courtyard, roof terrace, excavation to create basement storage and 38 car parking spaces with access from Horseferry Road. Namely, to allow amendments including removal of car parking stacking system, revised new basement floor layout, reduction in car parking spaces to 26, and provision of 5 electric charging points'. NAMELY, to amend the description of development to read as follows: 'Demolition and redevelopment of the site to provide a residential complex comprising 39 units of apartments integrated with facilities including communal kitchen cafe, storage areas, wellness centre/spa, staff accommodation, staff offices, in two linked buildings of six storeys each, internal courtyard, roof terrace, excavation to create basement storage and car parking spaces with access from Horseferry Road'.
N I O C House 4 - 8 Victoria Street London SW1H 0NE
Variation of condition 1, 6 and 13 and removal of condition 8 and 18 of planning permission dated 11th September 2019 (RN 19/03450/FULL) for the refurbishment and extension of existing building to provide additional B1 (office) floorspace, use of ground floor for retail (Class A1) purposes and Class A3 (cafe/restaurant) purposes and gym (Class D2) at basement level; terraced infilling of central courtyard, creation of roof terraces together with green roofs; reconfiguration and provision of additional plant accommodation at basement and roof level; replacement windows and new entrances together with new shopfronts; new layout at ground level for accessible parking and refuse store; cycle parking and showers and servicing at basement level. NAMELY, to amend the approved drawings to reflect design and technical development changes post planning permission, including alterations to proposed roof plant, removal of green walls and retention and refurbishment of pentagon roof.