Parliamentary Estate Parliament Street London SW1A 2NU
Partial demolition of the 1980s extension with infilling of existing terrace space at 43-44 Parliament Street and development of a new facade to the Canon Row elevation; a new roof and mansard on 1 Parliament Street and 2-4 Canon Row; refurbishment of Bridge Street buildings; and alterations to ancillary residences to provide further accommodation for parliamentary uses (Sui Generis); associated temporary construction works. (Linked to 19/08290/LBC). REVISED SCHEME: including amendments to Canon Row facade, roof plan and form, pitch of Parliament Street mansard roof extension to north and northern lift overrun; increase in area of photovoltaics. RE-CONSULTATION following receipt of Addendum to originally submitted Environmental Statement (ES) and further information (EIA Reg 25) including updates to ES: Ch 4 Approach to assessment, Ch 6 Townscape & Visual Impact, Ch 7 Cultural Heritage, Ch 12 Ground Conditions, Ch 13 Cumulative Impacts
Parliamentary Estate Parliament Street London SW1A 2NU
Partial demolition of the 1980s extension with infilling of existing terrace space at 43-44 Parliament Street and development of a new facade to the Canon Row elevation; a new roof and mansard on 1Parliament Street and 2-4 Canon Row; refurbishment of Bridge Street buildings; and alterations to ancillary residences to provide further accommodation for parliamentary uses (Sui Generis); internal and external refurbishment, including installation of new building services; secondary glazing; and interiors; creation of new openings; and refurbishment of basement vaults, and associated works including temporary construction works. (Linked to 19/08287/FULL) REVISED SCHEME: including amendments to Canon Row facade, roof plan and form, pitch of Parliament Street mansard roof extension to north and northern lift overrun; increase in area of photovoltaics; internal amendments.
Development Site At 14 To 17 Paddington Green London
Variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. Namely, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme. NAMELY to re-plan block G and H to allow senior living accommodation in block G; associated external alterations including a single storey loggia and extension within the courtyard; associated residential amenities to ground floor and part basements of block G and part H; reduction in units from 216 - 203; introduction of PV panels on the roof of Block G; revised landscaping.
St Johns Church Kilburn Lane London W10 4AA
Variation of conditions 1 (and in turn conditions 3, 7, 9, 13, 16, 17, 20) of planning permission dated 21st December 2020 (RN:20/04245/FULL) for the Refurbishment and extension of the Old Vicarage building to convert existing boarding accommodation to provide 5 residential (C3) units; erection of new two storey residential block (plus basement) to the north comprising 4 houses with associated car and cycle parking and landscaping; demolition of sub station and replacement with part single, part two storey school building (Use Class D1) comprising classrooms, ancillary office (Site relates to Bales College). Namely, to add a Phasing Plan to phase the development.
36-37 Albert Embankment London Borough Of Lambeth London SE1 7TL
Demolition of all structures associated with the petrol filling station, decontamination/remediation and redevelopment of the site to comprise the retention, refurbishment and vertical extension to Vintage House (Use Class E) and development of two linked towers, in addition to basement levels, consisting of hotel accommodation (Use Class C1) together with ancillary floorspace, car and bicycle parking, and all necessary ancillary and enabling works.