25 Blomfield Road London W9 1AA
Excavation of basement level beneath footprint of existing house with walk on rooflights; Rebuilding of bathroom extension at lower ground floor; Erection of extension at ground floor level over octagonal wing and creation of new parapet; Erection of infill extension on northeast elevation; Remodelling of bay on southeast elevation at lower ground floor level; Erection of replacement dormer; Demolition of existing retaining walls on south east elevation and eastern lightwell and construction of new metal escape stairs in these location; Replacement of windows; Rationalisation of drainage, repair of stucco render, repair/ refurbishment and part replacement of existing roof, refurbishment/ replacement of existing chimney and pots; Installation of Plant Machinery; Erection of bin and bike store to front garden; and associated external alterations.
2-6 Stanhope Row; 16 Stanhope Row 36 And 37 Hertford Street 16a, 16B And 17 Market Mews
Demolition and replacement of existing fifth floor, demolition of existing plant room, and erection of a single storey roof extension at sixth floor to 2-6 Stanhope Row with replacement windows, terraces at fifth and sixth floors and remodelling works; demolition of 16 Stanhope Row, 16a, 16b and 17 Market Mews, excavation at basement level and erection of a four-storey (plus part basement floor) replacement building, all to provide an 82-bedroom hotel (Class C1). Demolition of 37 Hertford Street and erection of replacement building (basement to fourth floor mansard roof plus rooftop plant enclosure); and Internal and external alterations to 36 Hertford Street including demolition and remodelling of existing mansard roof; together with excavation at basement level to 36 and 37 Hertford Street to lower existing basement slab level; all to provide 16 residential dwellings (Class C3) along with provision for cycle parking, terraces, refuse storage and rooftop plant, together with other associated works.
8-10 Great George Street London SW1P 3AE
Confirmation that the demolition of roof top plant and enclosures constitutes a material operation to lawfully implement planning permission dated 8 November 2019 (RN:19/02730/FULL) for: Use of part ground and upper floors as a 134-room hotel (Class C1); use of part lower ground as a leisure suite (Class D2); use of ground floor as restaurant/bar (Class A3/A4), external alterations, including demolition to include the removal of the rooftop plant enclosures and replacement with a single storey extension, remodelling of the Little Sanctuary elevation and introduction of balconies and lightwells.