Development Site At 25 - 28 Buckingham Gate London
Variation of Conditions 1 and 10 and removal of Conditions 8 and 9 of planning permission dated 26th September 2016 (RN: 15/05936/FULL) for the: demolition of existing office building and redevelopment to provide a replacement building over two basement levels, lower ground, ground and eight upper levels. Use of the building for residential purposes (Class C3) providing a maximum of 23 flats including 14 car parking spaces at basement level, accessed from Buckingham Gate. Namely, to extend the internal usable space at basement level 2 and reconfiguration of basement 1 without increasing the approved extent of foundations, internal alterations, amendments to window layouts at levels 7 and 8; and to vary the wording of Condition 10 to approve updated Sustainability and Energy Strategy and remove Conditions 8 (uninterrupted demolition and construction) and 9 (installation of PV panels on roof).
1-17 Shaftesbury Avenue London W1D 7EA
Amendments to planning permission dated 21st May 2019 (RN: 19/00087/FULL) for, 'Demolition of existing buildings and demolition behind retained facades of 19 and 20 Denman Street facades; realignment of 4-6 Glasshouse Street, 1 Sherwood Street, 8 Glasshouse Street and 11-17 Shaftesbury Avenue facades and retention of Piccadilly Lights (adverts). Construction of a replacement six storey building (plus 6th floor mezzanine office) with three basement levels to create a mixed use scheme comprising office (Class B1) at part ground to 6th storey mezzanine; retail (Classes A1 retail and A3 restaurant) at part basement 1, part ground and part first floor; up to seven residential units (Class C3) at part first floor, part second floor and part third floor; and plant and cycle storage within the basement. Associated works including mechanical plant within roof enclosure and loading facilities; NAMELY; provision of sedum roof, internal alterations to the layout of the residential flats, replacement of glass roof maintenance balustrade on Denman Street with metal balustrade; alterations to window dimensions, slate roof and ceramic cladding on Sherwood Street; alterations to the Shaftesbury Avenue roof mansard; minor modifications to roof grating, roof facet on Denman Street, alterations to the slate roof to allow for improved roof maintenance access; and addition of sprinkler inlet point on Denman Street.
Development Site At Carrington Street Car Park, 51-53 Brick Street And 1-6 Yarmouth Place London
Amendments to planning permission dated 21 October 2019 (RN: 18/04163) for: Variation of Conditions 1, 8,and original condition 24 and removal of Condition 10 of planning permission dated 23 February 2018 (RN: 16/11248) for Demolition of existing buildings on site and redevelopment to provide up to 30 residential units (Class C3), office floorspace (Class B1), gymnasium (Class D2), retail art gallery (Class A1), restaurant (Class A3) and retail (Class A1) floorspace; creation of a new pedestrian link through the site between Yarmouth Place and Carrington Street; erection of buildings either side of the new pedestrian link between 4 and 8 storeys in height excavation to create additional basement accommodation provision of on site car parking, cycle parking and delivery bay on Yarmouth Place new landscaping including improvement works to Yarmouth Place associated alterations; NAMELY to amend the approved drawings to changes to the party wall with 100 Piccadilly and increase the number of car parking spaces by (additional 44 spaces) within the development, and to change the wording of Condition 8 to allow the demolition and construction phases of the COCP to be submitted separately, and to allow the demolition clauses to be included in the S106 agreement. Further alterations received to reduce the size of the basement levels at 01-04; reduction in the size of the art gallery and gym; parking entrance reconfigured; Yarmouth Place elevation amended. Namely, various reconfigurations of cores, residential layouts, car lifts and flats, the realignment of the boundary walls and replacement of Condition 38 (waste storage).