Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works, namely to amend the wording of Condition 6 to allow for revised CIL phasing.
21A Warlock Road London W9 3LP
Demolition of garage and construction of new residential dwelling house (Class C3). (Application is for Outline Planning permission for access, scale and landscaping and with some matters reserved namely appearance and layout).
Development Site At Former 300 Harrow Road London
Variation of condition 1 of planning permission dated 23rd October 2020 (RN:19/09638/FULL) for the Demolition of existing community centre (Use Class D1) and nursery (Use Class D1) buildings and associated structures and replacement with three blocks (Blocks A, B and C) to create residential dwellings (Use Class C3), office floorspace (Use Class B1), cafe (Use Class A1), replacement community space (Use Class D1) and replacement nursery (Use Class D1). Landscaping and public realm alterations (including to the base of Wilmcote House); provision of car parking and cycle parking, refuse storage; provision of new boundary treatment; alterations to services; plant and associated works from RN:19/09638/FULL. Namely, to allow alterations to the tenure to 100% affordable housing, internal alterations including removal of built in wardrobes, alterations to windows and doors (internal and external), amend curtain wall panels, alter rainwater pipe location, new canopies to entrances, alterations to materials to part of nursery, alterations to heat network, elevation changes, alterations to Harrow Road public realm.
Land At 18 Blackfriars Road And 1-7 Stamford Street Together With Land At 18 Blackfriars Road Bounded By Stamford Street Paris Garden And Christ Church, London, SE1
Part demolition to the rear of 1 and 3 - 7 Stamford Street together with: the erection of a ground plus three-storey podium comprising retail, leisure, office, education, gallery, library and assembly room uses; two levels of basement for servicing, plant, car and cycle parking plus pit access within a partial basement at level three; two residential buildings of 22 and 40 storeys above podium; an office building of 45 storeys above podium; improvements to the existing public house; landscaping at ground and podium levels; replacement boundary at the southern edge of the Site; plant and all other associated, enabling and ancillary works.
Darwin House 104 Grosvenor Road London SW1V 3LH
Amendments to planning permission dated 08 November 2021 (RN: 20/06899/COFUL) for 'Redevelopment of the site on a phased basis. Phase 1 - Demolition of 23 garages and former Balmoral Castle Public House. Phase 2 - Erection of a part seven storey, part six storey and part five storey building to provide community supporting housing (Class C3) (Block A). Phase 3 - Demolition of Darwin House. Phase 4 - Erection of part five storey and part four storey building to provide housing (Class C3) (Block B). All together with new public open space, hard and soft landscaping, car parking, cycle parking, plant and other associated works in each phase'. Namely, to amend the glazed side vision panel to some residential entrances from a half height window to a full height window on the east elevation of Block A and the north elevation of Block B.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (ref. 20/03307/FULL) for 'Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works' namely to amend the current wording of condition 34 which relates to the contaminated land site investigation.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. Namely, to amend the current wording of conditions 45 and 47 of planning permission to allow a phased discharge of conditions.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18 October 2022 (RN: 20/03307/FULL) for the: Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. NAMELY, to allow amendments to Building C, comprising the separation of the basements of Building A and C, reduction in floor to floor heights, enlargement of cores, revised housing mix and associated internal alterations, addition of fixed guarding and amendments to the Ebury Street facade; and associated alterations.
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. Namely, to amend the wording of Condition 4 to exclude demolition works from the conditon.
Development Site At Former 300 Harrow Road London
Amendments to planning permission dated 23 October 2020 (RN:19/09638/FULL) for demolition of existing community centre (Use Class D1) and nursery (Use Class D1) buildings and associated structures and replacement with three blocks (Blocks A, B and C) to create residential dwellings (Use Class C3), office floorspace (Use Class B1), cafe (Use Class A1), replacement community space (Use Class D1) and replacement nursery (Use Class D1). Landscaping and public realm alterations (including to the base of Wilmcote House); provision of car parking and cycle parking, refuse storage; provision of new boundary treatment; alterations to services; plant and associated works. Namely, decentralised water source heat pumps (WSHPs) will be located in each apartment and connected to the ambient loop.