Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
St Johns Church Kilburn Lane London W10 4AA
Variation of conditions 1 (and in turn conditions 3, 7, 9, 13, 16, 17, 20) of planning permission dated 21st December 2020 (RN:20/04245/FULL) for the Refurbishment and extension of the Old Vicarage building to convert existing boarding accommodation to provide 5 residential (C3) units; erection of new two storey residential block (plus basement) to the north comprising 4 houses with associated car and cycle parking and landscaping; demolition of sub station and replacement with part single, part two storey school building (Use Class D1) comprising classrooms, ancillary office (Site relates to Bales College). Namely, to add a Phasing Plan to phase the development.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY, to allow alterations to facade of 19- 35 Baker Street- Baker Street Office Building (Building C) at ground, first, fifth, sixth, seventh, eighth and roof level; amendments to 88-110 George Street, including 112 George Street (Building D) at lower ground floor, ground floor, first, fifth, sixth, seventh, eight and roof level; and changes to condition 42 to read : "You must apply to us for approval of a detailed external lighting strategy which includes details of all light fittings and lighting levels. You must not start any work on this part of the development until we have approved what you have sent us. You must then install all lighting in accordance with the approved external lighting strategy".
United Kingdom House 180 Oxford Street London W1D 1NN
Variation of Condition 1 of planning permission dated 22nd January 2020 (RN: 19/06551/FULL) for, 'Infilling of internal light wells at fourth to seventh floor levels to create additional office space (Class B1) together with extension at roof level to provide a new eighth floor level comprising four residential units with part mezzanine (Class C3), the recladding of light well walls with minor internal alterations, new residential entrance, and plant in an enclosure at roof level; NAMELY, to make the following amendments to the approved development - mansard structure constructed in steel rather than concrete; existing staircases enlarged to accommodate fire access and escape; internal reconfigurations to the 7th floor; changes to the approved lift overrun and stair core; internal re-configuration of the apartments; reconfiguration of green roofs; addition of green walls to terraces and alterations to fenestration. (Application under Section 73 of the Act).
Apex 1 Site, Apex Development Zone New Covent Garden Nine Elms Lane London Borough Of Wandsworth London SW8 5BH
Reserved matters application for access, layout, appearance, scale and landscaping in relation to Phase 3B (building A1), the construction of Apex 1, within the Apex Development Zone of NCGM pursuant to planning permission reference 2014/2810 dated 12 February 2015 for part outline and part detailed planning permission for: (a) demolition of existing wholesale Fruit and Vegetable and Flower Market and ancillary buildings and structures, and residential building on Nine Elms Lane (apart from the existing multi storey car park); (b) Construction of mixed-use redevelopment comprising: a new Fruit and Vegetable Market and Flower Market and ancillary uses, including temporary and permanent facade; refurbishment and extension of existing waste collection area (including rooftop sports pitches); residential dwellings; flexible commercial uses, including retail, financial and professional services, cafe/restaurant, bar uses and hot food takeaways and offices; non-residential institutions; assembly and leisure uses; temporary storage and distribution buildings and associated works; associated car, cycle and motorcycle parking and servicing and new vehicle accesses, energy centres; and landscaping public realm and open space including part of the Linear Park. All matters reserved apart from access, details of all new markets and supporting buildings, and details of Building N8 and associated landscaping); (c) Site clearance and enabling works.. The approved outline planning permission included the submission of an Environmental Impact Assessment
Apex 1 Site, Apex Development Zone New Covent Garden Nine Elms Lane London Borough Of Wandsworth London SW8 5BH
Reserved matters application for access, layout, appearance, scale and landscaping in relation to Phase 3B (building A1), the construction of Apex 1, within the Apex Development Zone of NCGM pursuant to planning permission reference 2014/2810 dated 12 February 2015 for part outline and part detailed planning permission for: (a) demolition of existing wholesale Fruit and Vegetable and Flower Market and ancillary buildings and structures, and residential building on Nine Elms Lane (apart from the existing multi storey car park); (b) Construction of mixed-use redevelopment comprising: a new Fruit and Vegetable Market and Flower Market and ancillary uses, including temporary and permanent facade; refurbishment and extension of existing waste collection area (including rooftop sports pitches); residential dwellings; flexible commercial uses, including retail, financial and professional services, cafe/restaurant, bar uses and hot food takeaways and offices; non-residential institutions; assembly and leisure uses; temporary storage and distribution buildings and associated works; associated car, cycle and motorcycle parking and servicing and new vehicle accesses, energy centres; and landscaping public realm and open space including part of the Linear Park. All matters reserved apart from access, details of all new markets and supporting buildings, and details of Building N8 and associated landscaping); (c) Site clearance and enabling works. The approved outline planning permission included the submission of an Environmental Impact Assessment.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works NAMELY, to allow alterations including alterations at ground floor level and at 10th floor roof level including a new roof top room, roof terrace and alterations to plant enclosure at 19-35 Baker Street, new risers at 3rd floor to roof level at 30 Gloucester Place, introduction of increased flexibility to the commercial units across the ground floor and to remove the existing tree situated directly to the front of the newly approved entrance and replace it with a new tree to the south-west corner of Gloucester Place.
70 - 72 Piccadilly London W1J 8HP
Amendments to planning permission dated 4th March 2020 (RN 18/10021/FULL.) for the part demolition of, and extensions to, the existing buildings, including a 2 storey roof extension; the refurbishment of the existing and creation of new office (Class B1), hotel (Class C1), retail (Class A1 - A5) and Leisure and non-residential institutions (Class D1 - D2) floorspace with ancillary functions; basement refurbishment works; the erection of a 5 storey pavilion on the corner of Piccadilly and Dover Street; Installation of plant at roof level; hard and soft landscaping works as part of an improved public realm offering at Dover Yard and pedestrian route between Dover Street and Berkeley Street, including the creation of additional retail outlets; and other ancillary works. (Site includes 1 - 7 Berkeley Street) NAMELY, to change the description of development to Part demolition of, and extensions to, the existing buildings, including a 2 storey roof extension; the refurbishment of the existing and creation of new office, hotel, retail/commercial, and Leisure and non-residential institutions floorspace with ancillary functions; basement refurbishment works; the erection of a 5 storey pavilion on the corner of Piccadilly and Dover Street; Installation of plant at roof level; hard and soft landscaping works as part of an improved public realm offering at Dover Yard and pedestrian route between Dover Street and Berkeley Street, including the creation of additional retail outlets; and other ancillary works. (Site includes 1 - 7 Berkeley Street).