1 London Wall Buildings London Wall City Of London London EC2M 5PG
Request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping.
100 Liverpool Street City Of London London EC2M 2RH
Request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including the Museum of London Rotunda and Bastion House, 140 - 150 London Wall. The proposed development comprises demolition of the existing buildings and erection of three new buildings for office, culture, community and retail uses; formation of new basement areas; reconfiguration of the existing gyratory; reconfiguration of the access/egress arrangements for London Wall Car Park; removal of existing areas of the highwalk and formation of new areas of highwalk and the provision of new public realm and landscaping.
Thavies Inn House 3 - 4 Holborn Circus City Of London London EC1N 2HA
Demolition of the existing building at 1-6 Holborn Circus (known as Thavies Inn House) and the erection of a ten storey Class E building for office use with Class E retail use at part ground floor level with works to include reinstatement and new pedestrian routes through the site; hard and soft landscaping works including removal and replacement trees within the public highway, and creation of pocket park in Thavies Inn; widening of the footway on St Andrew Street; and other works incidental to the proposed development.
2 - 3 Finsbury Avenue City Of London London EC2M 2PA
Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and nonresidential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development. (The development would provide 85,009sq.m GEA of office floorspace (Class E); 4,397sq.m GEA of commercial, business and service uses (Class E); 1,097sq.m of flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); 2,239 sq.m GEA of learning and non-residential institutions uses (Class F1); and 16,058sq.m of ancillary plant, back of house and storage; total floorspace 108,800sq.m GEA; overall height 170.290m AOD). The application is accompanied by an Environmental Statement which is available for inspection with the planning application. Electronic copies of the ES can also be issued by Trium Environmental Consulting LLP; for further details contact [email protected] or Tel: +44 (0) 203 887 7118.
7 Holbein Place Royal Borough Of Kensington And Chelsea London SW1W 8NR
Proposed development at: Strand House, 7 Holbein Place, LONDON, SW1W 8NR. Description of Development: Demolition of roof structures and fourth floor level and erection of fourth, fifth floor and part sixth floor for office (Class B1) use. Construction of roof terrace and plant enclosure. Replacement of windows and plant. Insertion of green walls. Creation of ground floor entrance. Landscaping works and other associated external works. (MAJOR APPLICATION)