Top Banana Antiques 1 New Church Street Tetbury Gloucestershire GL8 8DS
Re-painting of existing sash windows in primrose yellow paint colour (retrospective)
86 Lamberts Field Bourton-on-the-Water Cheltenham Gloucestershire GL54 2EH
Erection of wooden garage (Retrospective)
1 London Street Fairford Gloucestershire GL7 4AH
Install two security cameras on the rear wall of the Restaurant (Retrospective)
Bank House High Street Fairford Gloucestershire GL7 4AD
Opening up of existing cellar, installation of new timber stud partition and door (retrospective)
Green Dragons High Street Chipping Campden Gloucestershire GL55 6AL
Compliance of condition 2 (Natural Cotswold Stone Slates) of consent 21/03678/LBC - Partially retrospective and proposed roofing works
The Wine Warehouse 4 - 6 Hampton Street Tetbury Gloucestershire GL8 8JN
Changes to internal layout, including changes to internal stair configuration and other associated works (Retrospective)
18 Lawrence Road Cirencester Gloucestershire GL7 1SD
Erection of rear single storey extension (retrospective)
The Old Haulage Yard Cirencester Road Birdlip Gloucester Gloucestershire GL4 8JL
Compliance with conditions 2 (Wood cutting / processing) and 6 (Cycle parking) of permission 23/00294/FUL - Change of use from microbrewery use only to Jays Timber Limited for use as a Timber and Fencing Yard (Use Class B2) (retrospective)
Plot W.19 Coln Park Claydon Pike London Road Lechlade Gloucestershire
Compliance with condition 9 (Lakeside fencing) and 12 (Occupants' Welcome Pack) of permission 21/03483/FUL - Variation of Conditions 2 (drawing numbers), 7 (landscaping), 9 (fencing), & 10 (biodiversity enhancement) of planning permission 20/03519/FUL to enable the substitution of amended plans, to vary the extent & features of the outdoor decking, unit fenestration & features, and access road layout (partially retrospective)
Paxford House Paxford Chipping Campden Gloucestershire GL55 6XQ
Addition of concrete slabs to ground floor annexe rooms and playroom. Limecrete slabs to kitchen, ground floor lobby, pantry, and laundry of the house. Demolition of masonry wall and formation of new partition wall between pantry and laundry. Re-instatement of floor surfaces at ground floor (part retrospective).