Hillbrook House Upper Oddington Moreton-In-Marsh Gloucestershire GL56 0XN
Demolition of conservatory, conversion of garage, erection of single storey rear and side extensions. Change of roof material, loft conversion and addition of new dormer windows to front and rear
Green Farm Cottage Lower Oddington Moreton-In-Marsh Gloucestershire GL56 0UP
Proposed two-storey extension to the rear of the property and adjacent single storey extension, proposed alterations to the existing property including new windows/dormer and demolition of existing lean-to conservatory, and proposed home office to the rear of the garden
Great Union House Market Place Northleach Cheltenham Gloucestershire GL54 3EJ
Compliance with conditions 4 (sample materials) and 5 (design details) of permission 23/01598/FUL - Compliance with conditions 3 (sample materials), 4 (design & details), 6 (MVS details), 7 (architectural record), 8 (method statement - new opening) & 9 (method statement - basement ceiling) of consent 23/01886/LBC - Demolition of modern extensions, kitchen and chimney to stair tower, rebuilding of kitchen, replacement of windows, 2no. flat-roofed rear dormers replaced with pitched-roof, 1no. rear dormer re-roofed with leadwork, installation of integral PV tiles to coach house roof and addition of EV charging point; removal and re-location of incoming utilities, re-covering of roof; internal alterations
Great Union House Market Place Northleach Cheltenham Gloucestershire GL54 3EJ
Demolition of modern extensions, kitchen and chimney to stair tower, rebuilding of kitchen, replacement of windows, 2no. flat-roofed rear dormers replaced with pitched-roof, 1no. rear dormer re-roofed with leadwork, installation of integral PV tiles to coach house roof and addition of EV charging point; removal and re-location of incoming utilities, re-covering of roof; internal alterations (revised scheme)
Great Union House Market Place Northleach Cheltenham Gloucestershire GL54 3EJ
Variation of condition 2 (Approved plans) of permission 21/04742/FUL - Demolition of modern extensions, kitchen and chimney to stair tower, rebuilding of kitchen, replacement of windows, 2no. flat-roofed rear dormers replaced with pitched-roof, 1no. rear dormer re-roofed with leadwork, installation of integral PV tiles to coach house roof and addition of EV charging point; removal and re-location of incoming utilities, re-covering of roof
South Orchard House Banks Fee Lane Longborough Moreton-In-Marsh Gloucestershire GL56 0QG
Alterations and refurbishments including demolition of extension, erection of two storey rear extension, dormer window and replacement garage with associated landscaping works
Pond House Driffield Cirencester Gloucestershire GL7 5PY
Compliance with conditions 3 (Materials), 4 (Window and door details) and 5 (Cast iron goods) of permission 21/00834/FUL -Amendments to 20/03233/FUL (Demolition of the existing modern double garage and replacement with a domestic annex) - addition of traditionally detailed porch canopy and dormer windows
White Ladies Redesdale Place Moreton-In-Marsh Gloucestershire GL56 0EQ
Demolition of detached garage, erection of replacement garage adjoining main dwelling, erection of two-storey rear extension, replacement of windows, addition of porch, dormer windows and bay window to front elevation and associated works
Great Union House Market Place Northleach Cheltenham Gloucestershire GL54 3EJ
Compliance with condition 6 (EVPC battery/cabling details) of permission 21/04742/FUL - Demolition of modern extensions, kitchen and chimney to stair tower, rebuilding of kitchen, replacement of windows, 2no. flat-roofed rear dormers replaced with pitched-roof, 1no. rear dormer re-roofed with leadwork, installation of integral PV tiles to coach house roof and addition of EV charging point; removal and re-location of incoming utilities, re-covering of roof - and condition 5 (EVPC battery/cabling details) of consent 21/04743/LBC - Demolition of modern extensions, kitchen and chimney to stair tower, rebuilding of kitchen, replacement of windows, 2no. flat-roofed rear dormers replaced with pitched-roof, 1no. rear dormer re-roofed with leadwork, installation of integral PV tiles to coach house roof and addition of EV charging point; removal and re-location of incoming utilities, re-covering of roof; internal alterations
1 The Quadrangle Naunton Cheltenham Gloucestershire GL54 3AT
Erection of dormer window to rear elevation and part demolition of Cotswold stone garden wall to create parking area