Templis Broadwell Moreton-In-Marsh Gloucestershire GL56 0TU
Change of use of agricultural land to residential land and addition of boundary fence, hedge and driveway turning area
Land At Grid Reference 398111 195688 Kemble Wick Kemble Gloucestershire
Installation of a solar farm comprising an array of ground mounted solar PV panels with associated infrastructure including housing for inverters, transformers and electrical equipment, a substation compound, fencing, security cameras, access tracks, associated landscaping and cabling for grid route of approx. 7.9 kilometres in length. Variation of Conditions 2 (approved drawings) and 17 (Noise Impact) of permission 21/02735/FUL to remove the use of standalone inverters and replace with the use of string inverters,
Land At Grid Reference 398111 195688 Kemble Wick Kemble Gloucestershire
Installation of a solar farm comprising an array of ground mounted solar PV panels with associated infrastructure including housing for inverters, transformers and electrical equipment, a substation compound, fencing, security cameras, access tracks, associated landscaping and cabling for grid route of approx. 7.9 kilometres in length.
Land At Grid Reference 403536 198745 Ashton Road Siddington Gloucestershire
Removal of Condition 9 (ecology assessment) of 20/04499/FUL (Construction of a temporary 19.94MW Solar Farm, to include the installation of Solar Panels with transformers, a DNO substation, customer substation, security fence, landscaping and other associated infrastructure (including a temporary construction access point) to allow for connection works under permitted development
Land At Grid Reference 403536 198745 Ashton Road Siddington Gloucestershire
Construction of a temporary 19.94MW Solar Farm, to include the installation of Solar Panels with transformers, a DNO substation, customer substation, security fence, landscaping and other associated infrastructure (including a temporary construction access point)