Peglers Garage Workshop London Road Tetbury Gloucestershire GL8 8JQ
Compliance with condition 3 (Sample materials), 4 (Sample walling - boundary walls), 5 (Sample walling panel), 6 (Details) and 10 (Contamination 1) re permission 20/00834/FUL - Demolition of existing MOT garage and erection of 9 new homes with associated access, parking and landscaping
1 Moorgate Downington Lechlade Gloucestershire GL7 3EH
Compliance with condition 8 (boundary treatment) of planning permission 18/01635/FUL - Erection of new 4 bedroom detached dwelling with detached garage
Akers Barn Washpool Lane Kemble Cirencester Gloucestershire GL7 6FY
Erection of a single storey extension to dwelling and boundary walling
Orchard Lee Clayfurlong Grove Kemble Cirencester Gloucestershire GL7 6AS
Non-material amendment to amend the height and type of fence of permission 21/00907/FUL Erection of boundary fence
The Steps 30 Great Rissington Cheltenham Gloucestershire GL54 2LN
Erection of garage and creation of new vehicular entrance. Rebuild dry-stone boundary wall to 1.5m high
1 Brewery Mews Gloucester Street Cirencester Gloucestershire GL7 2DH
Erection of stone boundary wall with integrated sheds
Oakfield 17 Brockhampton Cheltenham Gloucestershire GL54 5XH
Erection of detached garage, boundary wall and associated works
16 Bathurst Road Cirencester Gloucestershire GL7 1SA
Erection of boundary fence (retrospective)
2 St Peters Road Cirencester Gloucestershire GL7 1RG
Erection of home office outbuilding and re-build of boundary wall
Land Parcel Between Sandy Lane Court And Southgate Court Sandy Lane Court Upper Rissington Gloucestershire
Compliance with conditions 10 (Nest boxes), 17 (Cycle storage), 22 (Sample panel render), 23 (Roughcast render) and 25 (Design details) of permission 20/04548/FUL - Erection of 26 dwellings with landscaping, vehicular access, pumping station and all associated works - Variation of Conditions 2 (drawing numbers), 3 (boundary treatments), 7 (Landscape Management Plan), 9 (Reptile Survey), 12 (street management), 13 (fire hydrants), 15 (Construction Method Statement), 19 (Tree Protection Strategy), 20 (sample materials), 21 (sample panels), 24 (sample woodwork), 26 (contamination), 27 (remediation) 28 (foul water disposal), 29 ( surface water drainage), 30 (lighting), 32 (foul water disposal) of permission 17/04587/FUL to enable alterations to the design of the approved scheme and the agreement of details previously reserved by condition