Boldridge Farm Crudwell Lane Long Newnton Tetbury Gloucestershire GL8 8RT
Compliance with condition 13 (Drainage) of permission 21/03629/FUL - Demolition of farmhouse (western dwelling); the demolition of the modern elements and the erection of an extension to the older part of the existing cottage (eastern dwelling): conversion of Cart Barn to be used for home offices and other ancillary rooms; renovation of Stables and erection of replacement dwelling; demolition and relocation of Agricultural building; the installation of a ground sited solar array; and associated works including drainage engineering
Boldridge Farm Crudwell Lane Long Newnton Tetbury Gloucestershire GL8 8RT
Compliance with condition 8 (Ecological Design Strategy) of permissions 21/03629/FUL - Demolition of farmhouse (western dwelling); the demolition of the modern elements and the erection of an extension to the older part of the existing cottage (eastern dwelling): conversion of Cart Barn to be used for home offices and other ancillary rooms; renovation of Stables and erection of replacement dwelling; demolition and relocation of Agricultural building; the installation of a ground sited solar array; and associated works including drainage engineering
Paxford House Paxford Chipping Campden Gloucestershire GL55 6XQ
Compliance with conditions 3 (House sparrow boxes), 5 (Sample materials), and 11 (Strengthening beams, trusses & lintels) of consent 21/02635/LBC - External and internal alterations to the main dwelling and annexe including enclosing courtyard, change of use of barn outbuildings from agricultural to residential use including alterations and extension, and alterations of accesses including new vehicular entrance
Boldridge Farm Crudwell Lane Long Newnton TETBURY Gloucestershire GL8 8RT
Demolition of farmhouse (western dwelling); the demolition of the modern elements and the erection of an extension to the older part of the existing cottage (eastern dwelling): conversion of Cart Barn to be used for home offices and other ancillary rooms; renovation of Stables and erection of replacement dwelling; demolition and relocation of Agricultural building; the installation of a ground sited solar array; and associated works including drainage engineering