Feast Junction Hertford Place Coventry CV1 3JZ
Outline application for a residential tower for student accommodation with details of access and scale to be discharged and details of appearance,landscaping and layout to be reserved.
Land North and South of the A45 Eastern Green Coventry CV5 Coventry
Submission of details to discharge condition No. 26 in part(Archaeological Evaluation Report); imposed on planning permission reference OUT/2018/3225 granted on 30/09/2021 for residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks.
Eastern Green South of the A45 Coventry CV5 7LG Coventry
Submission of details to discharge condition Nos. 11,21 (phase 1 only) ,22,26 (in part and phase 1 only),35,36,37,38; imposed on planning permission reference OUT/2018/3225 granted on 02/06/2021 for residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks
Land bounded by Bond Street, Hill Street and Ryley Street Coventry West Midlands CV1 4A Coventry
Submission of details to vary condition 3 -to allow for a change in Use Classes; imposed on planning permission OUT/2015/2253 for Outline application for a mixed-use development with associated landscaping and engineering works including: Full details (access, appearance, landscaping, layout and scale) relating to the eastern part of the site for student accommodation (sui generis) including 590 bedrooms within a 20 storey high block and two lower blocks and A3/A4 floor space at ground floor level; and all matters reserved relating to the western part of the site for residential development (C3) up to 49 units and/or residential institutions (C2), granted 01.10.2015
Management Office City Village Bond Street COVENTRY West Midlands CV1 4FQ COVENTRY
Submission of details (glazing and curtain walling to retail units) to discharge condition 2 - sample details and materials schedule imposed on planning permission OUT/2015/2253 for Outline application for a mixed-use development with associated landscaping and engineering works including: Full details (access, appearance, landscaping, layout and scale) relating to the eastern part of the site for student accommodation (sui generis) including 590 bedrooms within a 20 storey high block and two lower blocks and A3/A4 floor space at ground floor level; and all matters reserved relating to the western part of the site for residential development (C3) up to 49 units and/or residential institutions (C2), granted on 5/10/2015.
Eastern Green South of the A45 Coventry CV5 7LG
Residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx. 1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks.