Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.
15a Ainsbury Road Coventry CV5 6BA Coventry
Variation of condition 2 (raised main dwelling ridge height, reduced first floor area above garage and other minor design changes): imposed on planning permission HH/2018/1410 for the erection of a two storey extension with dormer window and single storey side extension
122-126 Albany Road Coventry CV5 6NG Coventry
Variation of condition 2: (approved plans/drawings) to allow changes to window positions to front and rear elevations and to include rear dormers to each unit imposed on appliation FUL/2019/2770 for Erection of a building to create three commercial units for retail/professional service (Use Class A1/A2) granted on 29.4.2020.
Sandy Lane Business Park Unit 3 & 4 Sandy Lane Coventry CV1 4DQ Coventry
Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.)