Land to rear 61 Ansty Road Coventry CV2 3FG Coventry
Submission of details to discharge conditions Condition 4 - CMP, Condition 7 - Sustainable Building Statement, Condition 9 - Bats, Condition 11 - Ecological Habitat Enhancement, Condition 16 - Local Labour and Condition 17 - Drainage Plan: imposed on planning permission FUL/2018/2717 for residential development for the construction of seven 3-bedroom houses and five 4-bedroom houses, new access road, parking and landscaping and alterations to 61 Ansty Road granted 20/08/2020
Eden Square Coventry Stoney Stanton Road Coventry CV1 4FS
Submission of details to discharge Condition 15: Highway works imposed on planning permission S73/2020/2024 for "[Variation of conditions NO. 13 (AIR QUALITY MITIGATION MEASURES - TO REGULARISE UPDATED AIR QUALITY ASSESSMENT) and NO. 15 (TO ALLOW HIGHWAY WORKS TO BE CARRIED OUT 9 MONTHS AFTER FIRST OCCUPATION) imposed on planning permission reference S73/2020/0494 for "{{Variation of conditions 21 Soft Landscaping and 32 Drawing Numbers imposed on planning permission S73/2019/0550 for "[Variation of conditions 2 (construction method statement); 3 (local employment); 6 (drainage); 8 (UXO); 11 (remediation scheme); 13 (air quality mitigation measures); 14 (glazing and ventilation); 15 (offsite highway works); 16 (student accommodation management plan); 17 (cycle parking and bin storage); 18 (hard landscaping); 21 (soft landscaping); 22 (bat surveys); and 32 (drawing numbers): imposed on planning permission FUL/2017/0578 for the refurbishment, part demolition, alteration and extension of former nurses accommodation and outpatients clinic and erection of a 5 storey free-standing building to provide 322 bed spaces of student accommodation within cluster flats/studios with associated communal space, free-standing A3 unit (cafe/restaurant), related works and infrastructure]}}" as granted on 24/06/2020"] as granted on 23/10/2020
Shree Gurjarati Hindu Satsang Mandal Harnall Lane West Coventry CV1 4EZ
Submission of details to discharge conditions 3-materials and 7-construction method statement: imposed on planning permission FUL/2017/0288 for extensions and external alterations to include a new community hall, refurbished W.C.'s, new storage space and ancillary accommodation granted 30/05/2017
Finham Park School Green Lane Coventry CV3 6EA
Retrospective planning application for the Construction of gatehouse secure lobby with carparking alterations ,internal palisade fencing and vehicle gates to create an airlock entrance system to manage access and egress for safeguarding of the site.
168-170 Lockhurst Lane Coventry CV6 5NY Coventry
Discharge of Conditions 7 (Construction Management Plan) imposed on FUL/2020/0885 for Demolition of existing building, canopy link and Jet wash bay and Erection of new sales building constructed with external compound/refuse area enclosed by 2m fence, existing car wash converted to jet wash bay and associated alterations granted on 16/06/2020.
61 Ansty Road Coventry CV2 3FG Coventry
Non material amendment-Substitution of house type plans and site layout to application reference FUL/2018/2717, grante don 20th August 2020 for residential development for the construction of seven 3-bedroom houses and five 4-bedroom houses, new access road, parking and landscaping and alterations to No.61 Ansty Road
Coventry And Warwickshire Hospital Stoney Stanton Road Coventry CV1 4FS
Variation of conditions NO. 13 (AIR QUALITY MITIGATION MEASURES - TO REGULARISE UPDATED AIR QUALITY ASSESSMENT) and NO. 15 (TO ALLOW HIGHWAY WORKS TO BE CARRIED OUT 9 MONTHS AFTER FIRST OCCUPATION) imposed on planning permission reference S73/2020/0494 for "{{Variation of conditions 21 Soft Landscaping and 32 Drawing Numbers imposed on planning permission S73/2019/0550 for "[Variation of conditions 2 (construction method statement); 3 (local employment); 6 (drainage); 8 (UXO); 11 (remediation scheme); 13 (air quality mitigation measures); 14 (glazing and ventilation); 15 (offsite highway works); 16 (student accommodation management plan); 17 (cycle parking and bin storage); 18 (hard landscaping); 21 (soft landscaping); 22 (bat surveys); and 32 (drawing numbers): imposed on planning permission FUL/2017/0578 for the refurbishment, part demolition, alteration and extension of former nurses accommodation and outpatients clinic and erection of a 5 storey free-standing building to provide 322 bed spaces of student accommodation within cluster flats/studios with associated communal space, free-standing A3 unit (cafe/restaurant), related works and infrastructure]}}" as granted on 24/06/2020.
7 Innis Road Coventry CV5 6AX Coventry
Submission of details to discharge conditions 3- bat survey and 4-Construction Management Plan: imposed on planning permission HH/2020/0841 for extension and alteration including removal of garage, erection of side extension and new increased roof to create bedrooms in the loft by installing two front and one rear dormer granted 27/05/2020
Harper Road Coventry CV1 2AP Coventry
Submission of details to discharge condition 7-Construction Management Plan: omposed on planning permission S73/2019/2242 for Variation of condition 2 - Drawing numbers - (Minor alterations to internal entrance foyer to provide 2No. additional bedrooms - increase in bedspaces from 266No. to 268No. No external alterations proposed), pursuant to planning permission reference FUL/2017/2239 for the Demolition of existing Dairy Crest Distribution Depot with the erection of a three to six-storey student residential building containing 50 cluster flats totalling 266 student bedrooms with associated amenity space, communal facilities, bicycle parking and landscaping, determined by planning committee on 15/02/2018 (decision dispatched on 23/02/2018).
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.