21 Barmpton Lane DARLINGTON DL1 3HB
Approval of details reserved by Conditions 4 (internal highway layout), 5 (vehicle parking and cycle parking/storage), 6 (parking provision for 21 Barmpton Lane), 7 (vehicle swept path analysis), 8 (bin storage), 9 (construction method statement), 11 (boundary treatment), 12 (finished levels of ground floor), 13 (foul and surface water), 20 (implementation of ecological impact assessment) and 21 (survey of trees) attached to planning permission 21/01149/OUT dated 3 March 2022 (Outline application for the erection of 4 no. bungalows with all matters reserved except for means of access)
210 Coniscliffe Road DARLINGTON DL3 8PU
Erection of retaining wall to existing boundary wall to protect TPO Trees. Construction of garage with habitable space above to side of house, erection of single storey extension to rear and infill extension to existing conservatory and removal of steps. Conversion of attic back into habitable space including alterations to roof and reinstatement of windows to attic gables. Alterations to windows including replacing single glazed windows with double glazed upvc sash windows and installation of roof lights (additional Ecology Report received 16/06/2022 and Structural Condition Inspection Report received 11/07/2022) (as amended by plans received 27/04/2023, 19/07/2023 and 25/07/2023) and including tree works identified in Aboricultural Method and Impact Statements (Rev B) including Tree Protection Plan (received 19/07/2023)
37 Blackwell DARLINGTON DL3 8QT
Erection of double height entrance porch extension to front elevation, first floor extension over existing garage, two storey side extension, construction of glazed balcony to rear with privacy screen, alterations to windows and doors including Juliet balcony to rear, replacement roof and associated internal works and additional of white render to main house. Replacement of existing boundary wall with 1.8m high brick wall (Tree Method Statement and Foundation details received 28/04/2023) (As amended by plans received 09/06/2023, additional Arboricultural Impact Assessment and Method Statement received 18/05/2023)