Bonded Warehouse Former Friargate Goods Yard Stafford Street Derby DE1 1JL
Structural stabilisation works to dismantle damaged and unstable construction elements and to make safe the existing external walls. Temporary protection works to the remaining structure to prevent further collapse of residual roof elements and prevent ongoing water ingress.
Ashgate Primary School Ashbourne Road Derby DE22 3FS
Construction of two fire proof enclosures (mat stores)
The Silk Mill Industrial Museum 32 Full Street Derby DE1 3AF
Installation of a structure beneath the third floor in the Italian Mill to act as wind brace for the new Civic Hall construction (retrospective application)