20 New Street Sandwich CT13 9AB
Removal of existing external paint/render finishes to front and rear. Alterations to front elevation: replacement of rainwater goods, insertion of new brick arch to 1st floor, replacement of ground floor window. Alterations to rear elevation: enlargement of existing opening and installation of new window and door, 2 no roof lights and replacement of 1 no window with double glazed unit. Replace dormer roof and cheeks with lead to include installation of insulation and membrane. Roof repairs. Removal of internal cement render finishes and replacement with breathable plaster finishes. New plaster ceiling and replacement of floor with limecrete all to ground floor. Introduction of mechanical ventilation to kitchen and bathroom.
165 Middle Street Deal CT14 6LL
Replacement of existing dormer to rear to serve new ensuite bathroom. Renewal of kent peg roof. Replacement rear windows & door. Internal alterations to incl: Replacement of floor boards & part structure; Removal of modern fireplace surround to Dining Room & installation of beam; increase existing ceiling height to upper ground flr landing & bathroom.
93 Middle Street Deal CT14 6JN
Alterations and repairs to roof, roof structure and dormer, repair and capping of parapet gables, addition of stone coping, repair of front chimney stack and demolition of rear chimney stack
3 The Chain Sandwich CT13 9BJ
Works to facilitate conversion into 2no dwellings.Ground floor :Replace front door.Insert stud work to block rear door opening. Infill side window. Replace rear window. Replace rear window with doors. Remove side access gate. Side door replaced with window. Insert front elevation window. Remove and insert new wall partitions & openings. First floor: Block door opening to form first floor party wall. Insert new side window to ensuite. Remove & insert new partitions and openings . Second floor: Replace door. New timber structural alterations. Roof: Insert rear 1no rooflight Extend rear flat roof dormer. Construct 2 storey rear extension (existing rear addition and chimney demolished).
Maryville Shelvin Lane Wootton CT4 6RH
Internal works include: Ground floor: replace floor structure, insert new partitions to form bathroom, replace wall linings, replace doors. First Floor: Replace ceilings to bed 1 and 3, replace internal doors, insert new partitions to form en suite, replace wall linings, insert ridge support and beam to support roof structure, replace dormer window structure, part demolition and rebuild of 2no chimney stacks. External alterations Include: Front SW elevation: Remove canopy, replace 4no windows including dormer. Right flank SE elevation: Remove canopy, replace 1no window. Rear NE elevation: Replace 2no windows, insert 1no new window, insert roof light, remove canopy. Left flank NW elevation: pantile roof section replaced with Kent Peg tiles. Replace external paint finishes. Re roof inserting membrane.