New England Farm Upper Delph Drove Haddenham Cambridgeshire
Change of use of redundant agricultural buildings to provide for Class E, B2 General Industrial and B8 Storage and Distribution including external alterations and associated landscaping, access and infrastructure works
Land North Of 190 Wisbech Road Littleport Cambridgeshire
To discharge Condition No. 5 (Surface water drainage scheme) of Appeal Decision Notice APP/V0510/W/19/3243700 dated 17/02/2021 for change of Use of agricultural land to industrial (class B2) use and erection of a concrete manufacturing facility, with associated engineering and accommodation works and extension to an existing building and travelling crane rails
Land North Of 190 Wisbech Road Littleport Cambridgeshire
To discharge condition 6 (Archaeology), 7 (Construction and Environment Management Plan (CEMP)) of Appeal Decision Notice APP/V0510/W/19/3243700 dated 17/02/2021 for change of Use of agricultural land to industrial (class B2) use and erection of a concrete manufacturing facility, with associated engineering and accommodation works and extension to an existing building and travelling crane rails
Land North Of 190 Wisbech Road Littleport Cambridgeshire
To discharge Condition 8 (Noise Management Plan (NMP)) of Appeal Decision Notice APP/V0510/W/19/3243700 dated 17/02/2021 for change of Use of agricultural land to industrial (class B2) use and erection of a concrete manufacturing facility, with associated engineering and accommodation works and extension to an existing building and travelling crane rails
1 Bottisham Place Bottisham Cambridge CB25 9BB
Proposed change of use (only) of existing redundant Grade II Listed agricultural barn to E (light industrial) for the manufacture of timber pods (no alteration to barn)
Armtrac 70 Reach Road Burwell Cambridge CB25 0AH
Install a large battery to support the manufacturing, charging and discharging of a new line of battery powered agricultural robots as well as support the grid and local projects which will be used to charge the batteries and export wasted energy to support the local grid. There will be a UKPN meter room and 132kv transformer on existing hard standing close to the building where there is equipment all ready within the industrial site. The proposal will not exceed 50MW.