4 Hythe Lane Burwell Cambridge CB25 0EH
Construction of 2no. detached houses, with demolition of existing house and garage
Cold Harbour Farm Black Horse Drove Littleport Ely Cambridgeshire CB6 1EH
Demolition of single storey outbuilding
Broad Piece Soham Cambridgeshire
Residential development for 166 dwellings and identification of 9 self build plots, open space and associated infrastructure for previously approved 19/00717/OUM for proposed erection of up to 175 dwellings and associated infrastructure with access from Broad Piece
26 High Street Burwell Cambridge CB25 0HB
Conversion of shop to residential use, becoming part of the main dwelling to which the shop currently adjoins
Phase 2A Millstone Park Land Adjacent To Melton Farm Newmarket Road Burwell
Reserved matters for Layout, Scale, Appearance and Landscaping for Phase 2A for 133 dwellings, parking, internal roads, open space, landscaping, sustainable urban drainage and ancillary infrastructure pursuant to 15/01175/OUM (as varied by 15/01175/NMAA and 15/01175/NMAB)
Phase 1 Millstone Park Land Adjacent To Melton Farm Newmarket Road Burwell
Reserved matters comprising layout, scale, appearance and landscaping for 138 dwellings, internal roads, parking, open space, landscaping, associated drainage and ancillary infrastructure for Phase 1 (Housing) pursuant to outline planning permission 15/01175/OUM (as varied by 15/01175/NMAA and 15/01175/NMAB)
Block Fen Quarry Block Fen Drove Mepal Ely Cambridgeshire CB6 2AY
Variation of Condition 7 of planning permission F/0257/92/CM (extraction & processing of sand & gravel, as varied by F/02014/12/CM) to allow deferment of provision of tarmac surface to Block Fen Drove
Ellgia Limited Padnal Sidings Ely Road Prickwillow Ely Cambridgeshire CB7 4UJ
Demolition of fire-damaged building, erection of new portal frame building, erection of new processing line building and erection of litter-net fencing, with continued use of site for waste recycling and waste transfer
Tillicoultry Quarries Ltd Coated Stone Plant Queen Adelaide Way Ely Cambridgeshire
Removal of aggregate storage bays and existing coated stone plant, installation of replacement coated stone plant, erection of dry aggregate bays, weighbridge, the continued storage and distribution of aggregates, associated works and facilities, and biodiversity enhancements.
Willow Hall Farm Hillrow Causeway Haddenham Ely Cambridgeshire CB6 3PA
Construction of irrigation reservoirs by the extraction, processing and export of sand and gravel: widening vehicular access onto the A1123 at Doles Drove: mineral processing plant, weighbridge and 6 metre x 3 metre temporary office buildings