Land South Of Blackberry Lane Soham Cambridgeshire
Variation of condition 1 (Approved plans) of Application Reference Number: 19/01520/VARM for Variation of condition 2 (Approved plans) , 7 (Surface Water Drainage Scheme), 16 (Acoustic Bund and living willow fence along Eastern Boundary), 19 (The service road serving plots 36-43), 20 (The road, footpath and verges of the highway between Plot 5 and FW PS to the south of Blackberry Lane) and 28 (Surface Water Drainage Scheme pursuant to Condition 18) of previously approved 17/00893/FUM for Hybrid Planning Application - Full Application for the erection of 160 dwellings and associated access, parking and open space; Outline Application for 8 Self-Build Dwellings (retrospective)
Site South East Of 91 The Row Sutton Ely Cambridgeshire CB6 2PB
Variation of condition 1 (Approved plans), 3 (Walls, Roof, Windows and Doors Details), 4 (Drainage,) 5 (Soft Landscaping), 6 (Boundary Treatments), 8 (Tree Protection), 12 (Contamination), 15 (Construction Environmental Management Plan) and 16 (Access Improvements) of previously approved 18/00748/FUL for New dwelling and associated works
Builders Yard Rear Of 3-7 River Lane Fordham Cambridgeshire
To vary Condition 1 (Approved Drawings) and 8 (Boundary Treatments) of previously approved 18/00801/VAR for To vary condition 1 (Drawings) of the decision dated 20 December 2016 to amend the boundary treatments and design of PLOT 1 of the previously approved application 16/01436/FUL. (part retrospective)
Land Adjacent And Rear Of 2 Soham Road Fordham Cambridgeshire
To vary condition 7 (Landscape Plan) of previously approved 19/01518/FUL for retrospective application for the change of plot locations and boundary lines associated with 16/00496/OUT and amendments to plot design, including front porches
61 New Cheveley Road Newmarket Ely Suffolk CB8 8BG
To vary Condition 8 (Boundary Treatments) of previously approved 19/00900/VAR for Variation of condition 1 (approved plans) and 3 (Specified materials) of previously approved 18/00558/FUL for the erection of a single dwelling and associated infrastructure