Site South East Of 91 The Row Sutton Cambridgeshire CB6 2PB
To discharge Condition 3 (Material details) and 8 (Ecology mitigation) of appeal decision APP/V0510/W/22/3304498 dated 13 April 2023 for the construction of 3 bedroom two storey detached self-build dwelling, carport/workshop and siting/residential use of one mobile home for duration of works, and associated works
Phase 4C Land At Highfield Farm Ely Road Littleport Cambridgeshire
To discharge Condition 5 (biodiversity improvements ) and 18 (travel packs) of decision 22/00478/FUM dated 23 March 2023 for Construction of 77 residential dwellings (Replacing 77 previously approved house types)
Phase 4C Land At Highfield Farm Ely Road Littleport Cambridgeshire
To discharge Condition 6 (external materials), 7 (cycle stores), 8 (construction environmental management plan), 10 (management and maintenance), 14 (surface water & drainage), 15 (surface water management), 17 (fire hydrants), 20 (bin storage), 21 (energy & sustainability strategy) of decision 22/00478/FUM 23rd March 2023 for construction of 77 residential dwellings (Replacing 77 previously approved house types)
Land North Of Cam Drive Ely Cambridgeshire
To discharge condition numbers 12 (Construction Environmental Method Plan & Waste Audit), 18 (Archaeology - part b), 22 (Contamination - parts a-d) and 27 (Fire Hydrants) of Decision dated 20/06/2016 for Residential led development of up to 1,200 homes with associated employment and community uses (including care home or extra care home). Supporting infrastructure, and open space/landscaping on land to the west of Lynn Road in Ely
Land At Highfield Farm Ely Road Littleport Cambridgeshire
To discharge conditions 4 (Scheme Of Biodiversity Improvements), 5 (Materials), 11 (Visibility Splays), 15 (Welcome Travel Packs), and 16 (Soft Landscaping Scheme) on Decision 20/00821/FUM dated 8/6/2021 for Construction of 26 residential dwellings (Replacing 26 previously approved house types) phase 4B
Land At Highfield Farm Ely Road Littleport Cambridgeshire
To discharge Condition 5 (External surfaces), 6 (Cycle stores), 9 (Road management and maintenance), 10 (Surface water Drainage), 12 (Drainage), 13 (Fire hydrants), 14 (SUDS), 17 (Bin stores), and 18 (Energy and sustainability strategy) of Decision dated 08/06/2021 for Construction of 26 residential dwellings (Replacing 26 previously approved house types) phase 4B