Cadhay House Cadhay Ottery St Mary EX11 1QT
Roofing of East Range roof slopes to Cadhay House, including all associated leadworks, masonry works, insulation and timberworks.
Foundry Cottage Rosemary Lane Colyton EX24 6LS
Reduce height of chimney stack and cap on west elevation and remove non-breathable paint from external walls on north, east and west elevations using Doff and IBIX System
Symes Cottage Town End Broadclyst Exeter EX5 3HS
Replace 1no. window on ground floor south elevation; replace 3no. windows on ground floor and 2no. windows on first floor north elevation and 3no. windows on ground floor and 2no. windows on first floor west elevation with 14mm small paned double glazed units.
69 Fore Street Otterton EX9 7HB
Replaster all internal walls in lime plaster in sittiing room and remove modern brick fireplace surround in west sitting room.
Crossways Cottage Village Way Aylesbeare EX5 2FF
Secondary glazing in all windows on east, north and south elevations
Stoke Canon Signal Box Chestnut Crescent Stoke Canon
Dismantle redundant signal box and part of stone wall (C) and re-locate out of district to Wallingford, Oxfordshire
Colyton Guide Association Hq Rosemary Lane Colyton Devon EX24 6LS
Install secondary glazing to windows on front and rear elevations
Ferndale The Strand Lympstone EX8 5JS
Install 6 no. solar PV panels on both the rear north west elevation and 4no. solar PV panels on south east elevation of the annexe
Coryton Lodge Kilmington EX13 7RD
Reroofing and cladding existing side extension to match proposed single storey rear extension. Infilling existing window opening on south elevation, creating new opening on east elevation and adding two new roof lights to existing building. Construction of glazed veranda to rear of property, relocation of kitchen and oil tank with all associated works
Clyst St Lawrence Bridge Clyst St Lawrence EX15 2NW
Maintenance work to timber bridge parapet; replace four posts in hardwood where the softwood posts have rotten; replace all of the railings like-for-like in treated softwood; replace all of the washers with slightly larger square washers to prevent them pulling through; refix approximately nine metres of loose kerb stones; install Vergemaster RX flexible marker posts at either end of the bridge parapet (not attached to the structure).