Land At Park Industrial Estate Ermine Street Buntingford Hertfordshire SG9 9AZ
Telecommunications mast and associated equipment compromising the removal of existing 20 metre monopole, supporting 3 antennas and headframe, and installation of a new 22.5 metre monopole supporting 6 new antennas on a new open headframe, 1 relocated transmission dish, 1 new transmission dish and ancillary development thereto including Remote Radio Units (RRUs) and 1 GPS module
Telephone Exchange London Road Sawbridgeworth Hertfordshire CM21 9JJ
Retrospective creation of secure storage compound with 1 storage container (that will house equipment and materials in support of the local telecoms infrastructure network, such as excavations tools, ducting, fibre cable and man hole covers). The perimeter fence will be a heras galvanized metal fence with weighted plastic footings to the perimeter of the storage area.
Baldock Road Street Works Buntingford SG9 9DB
Proposed 15m 5G telecoms installation: H3G street pole and additional equipment cabinets.
Hoestock Road Sawbridgeworth Hertfordshire CM21 0DZ
Proposed 5G telecoms installation: H3G 15 metre street pole and additional equipment cabinets.
Tudor Way Hertford Hertfordshire
Proposed 5G telecoms installation: H3G 17m street pole and additional equipment cabinets.
London Road Street Works Sawbridgeworth Hertfordshire CM21 0EU
Proposed 5G telecoms installation: 20 metre height H3G street pole and additional equipment cabinets.
Stortford Road Streetworks Stortford Road Little Hadham Hertfordshire
Proposed telecommunications installation: Proposed 15.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.
Great Hadham Road Bishops Stortford Hertfordshire CM23 4NB
Proposed 5G telecoms installation: H3G 20m street pole and additional equipment cabinets.
Stansted Road Street Works Stansted Road Bishops Stortford Hertfordshire CM23 2FP
Proposed 5G telecoms installation: a new 15 metre H3G street pole and additional equipment cabinets.
Land At Harlow Road Bonks Hill Sawbridgeworth Hertfordshire
Proposed 5G telecoms installation: H3G Phase 8 20m high street pole c/w wrap-around cabinet and 3 further additional equipment cabinets.