New Street Farm Kents Lane Standon Hertfordshire SG11 1PG
Conversion of agricultural roadside barn to industrial, storage and distribution and commercial, business and services. Timber part glazed screen and wall added to the South elevation. New window added to East elevation. Internal alteration to remove partition wall, install new partition walls and doors.
31 High Street Ware Hertfordshire SG12 9BA
Part change of use of hairdressers to create 1, residential unit. Retention of facilities to hairdressers. Internal alterations to include erection of partition walls, creation of bathroom and insertion of extractor fan.
Anstey Hall Anstey Buntingford Hertfordshire SG9 0BY
Removal of three chimney stacks. Construction of single storey link extension between main dwelling and outbuilding. Closure of open car port with door and brickwork and alterations to fenestration. Installation of roof lantern and insertion of nine roof light windows. Creation of rear paved area and replacement of rear paving. Construction of external wall incorporating gate and relocation of manhole. Removal and installation of partition walls and doorways. Alterations to fireplace and installation of fireplace.
Dove Cottage Silver Street Anstey Buntingford Hertfordshire SG9 0DH
Demolition of modern side porch. Erection of single storey rear extension with solar paels. Construction of east and west open canopies. Installation of pedestrian gate. Alterations to fenestration. Removal and insertion of partition walls.
St Annes 17 Green End Braughing Ware Hertfordshire SG11 2PG
Demolition of rear conservatory, construction of replacement single storey rear extension, minor external works to rear hard landscaping to include partial demolition and alteration of existing retaining wall, removal of steps, alteration of patio level. Ground floor internal alterations to include the removal of partition walls, door and cupboard and install new partition wall.
Bucklers Hall Bucklers Hall Road Perry Green Hertfordshire SG10 6EB
Replacement of windows, with partial increase to 4 windows. Replacement of the cement render with lime and natural breathable insulation. Alterations to staircase to the eastern end of the main range and re-roofing.
2 Fair Green Sawbridgeworth Hertfordshire CM21 9AG
Erection of single storey side extension; single storey side infill extension; replacement roof to existing link building and partial garage conversion. Internal alterations: installation of utility room; new doorway through to entrance hall and installation of cloakroom; re-siting of boiler and hot water cylinder and alterations to entrance way and external and internal doorways.
33 North Road Hertford Hertfordshire SG14 1LN
Removal of ground floor and first floor rear projection and part of mono-pitched side roof. Conversion to create 5, 2 bedroomed dwellings. Excavation to basement. Construction of two storey and part single storey rear extension incorporating first floor rear facing balconies with glass balustrades. Construction of second floor side extension. Install 2 EV charging points at front and create bin and bicycle storage area to the rear, landscaping works. Replacement windows and increase size of rear basement window. Internal alterations to install new partition walls, in fill existing openings, form new openings and doors, install new stairs and remove partition walls.
16 High Street Buntingford Hertfordshire SG9 9AG
Internal alterations to the pub ground floor to infill 1 door, adjust bar joinery, install new partition wall, create new door and WC and all associated works.
60-62 High Street Ware Hertfordshire SG12 9DA
Change of use and conversion of Class E solicitors office into mixed use 2no. Class E units at ground floor and basement and 2no. C3 residential units at first and second floor including demolition of existing single storey rear extension, alterations and to back addition of pitched roof, installation of external staircase with attached bin/bike store, raised second floor rear wall, installation of new rear windows and doors, internal alterations, and the Installation of secondary glazing to front elevation with heat recovery system to the residential units.