3 Market Square Higham Ferrers Rushden NN10 8BP
Discharge of conditions pursuant to NE/21/01012/LBC - Part demolition of rear flat roof extensions and erection of 2 storey rear extension; Alterations to front door and windows; Internal works to allow for the change of use from offices to part retail and part residential (Revised resubmission to NE/21/00340/LBC). Condition 3 - Windows and doors full details - scale drawings, cross sections and details of colour/finish. Condition 4 - external joinery details including windows and doors. Condition 5 - mortar composition and sample (hydraulic lime mortar)
45 Main Street Aldwincle Kettering NN14 3EL
Discharge of conditions pursuant to NE/22/00190/LBC. Internal and external alterations to include demolition of existing extension and construction of new glazed extension, insertion of conservation rooflights, insertion of French doors, addition of ground floor utility and wc, create bathroom on first floor and en suite on second floor, erect external soil and vent pipe, replace defective Dining room window, and replacement roof structure. Condition 3 - scheme of external finishes Condition 4 - joinery details Condition 5 - details of replacement roof structure
26 Main Street Fotheringhay Peterborough PE8 5HZ
Discharge of Conditions pursuant to NE/23/00037/FUL: Internal and external alteration works to allow for conversion of two dwellings to singular dwelling, demolition of existing rear extension; addition of single storey extension. Condition 3 - Materials Condition 4 - Fenestration Condition 5 - Boundary Treatment Condition 6 - Tree Protection Condition 7 - Archaeology
29 Main Street Barnwell Peterborough PE8 5PX
Discharge of conditions pursuant to NE/21/00110/FUL. Demolition of existing attached garden-room and provision of new garden-room. Demolition of existing store building and provision of new 2 storey extension to existing house; minor alterations to existing house elevations, including replacement of existing windows and provision of new render to existing brickwork, relocation of existing main entrance and provision of new porch; and addition of solar panels. Condition 2 - material samples above slab level
3 Market Square Higham Ferrers Rushden NN10 8BP
Discharge of conditions pursuant to NE/21/01011/FUL. Change of Use from offices to part retail and part residential (3 apartments); Part demolition of rear flat roof extensions and erection of part single storey part two 2 storey rear extension; Alterations to front door and windows (revised resubmission to NE/21/00339/FUL) Condition 6 - details of the timber refuse store shown on the Proposed Site Plan ref. 20-098-01 Rev. A, to include the material, colour and measurements/elevations.
3 Market Square Higham Ferrers Rushden NN10 8BP
Discharge of conditions pursuant to NE/21/01012/LBC. Part demolition of rear flat roof extensions and erection of 2 storey rear extension; Alterations to front door and windows; Internal works to allow for the change of use from offices to part retail and part residential (Revised resubmission to NE/21/00340/LBC). Condition 3 - Window and door details including scale drawings, sections and finishes. Condition 4 - external joinery details including windows and doors Condition 5 - Mortar composition details for bedding and pointing stonework. Sample to be submitted.
3 The Lane Easton On The Hill Stamford PE9 3LP
Discharge of conditions pursuant to NE/22/00468/LBC. Internal and external alteration works to make dwelling habitable including essential repairs to the roof; addition of new roof lights; re-instatement of original blocked windows; new kitchen and bathroom; new boiler and under floor heating; demolition of garage and outbuildings. Condition 4 - comprehensive structural survey of the roof and method statement outlining the means and methodology of undertaking structural repairs to the roof of the building. The Collyweston Stone slates shall be retained and re-fitted to the roof in diminishing courses from eaves to ridge in a manner to accord with the previous roof form. Any shortfall of roof slates shall be made up of natural Collyweston Stone slates.
Prince William School Herne Road Oundle Peterborough PE8 4BS
Discharge of conditions pursuant to NE/22/00305/FUL - Demolition of the existing sports hall, creation of a new landscaped plaza opposite the main entrance, a new sports hall for school and community use including school exams, alterations to the existing car park for school buses and cars, including a new traffic island, pupil drop-off and collection area, and safe crossing points. Condition 8 - Demolition plan Condition 9 - Construction management plan
Lime House 4 East Road Oundle Northamptonshire PE8 4BX
Discharge of condition 2 - joinery details, pursuant to application 19/00687/LBC "Demolition of outbuildings, internal and external alterations to No. 6, Internal connection between No. 6 and No. 4 and internal alterations to No. 4 (re-submission 18/01553/LBC)"
Sports Hall Milton Road Oundle Northamptonshire PE8 4AB
Discharge of conditions pursuant to application 17/01338/VAR "Variation of condition 12 of application 16/02185/REM to permit a minor material amendment to the approved scheme through moving the footprint of the sports hall and swimming pool by 4m to the south, increasing the building height by 500mm, introducing of a stone spine feature wall adjacent to the main entrance into the building, extending the rear balcony to the north elevation and associated landscape alterations pursuant to outline application 14/00875/OUT for the demolition of existing swimming pool building and the erection of a new sports centre and other associated infrastructure works." Condition 5 - Solar panel; Condition 7 - Bike storage