Blotts Barn Brooks Road Raunds NN9 6NS
Discharge of conditions pursuant to 20/00486/FUL - Proposed Commercial Development for a B1 Office Unit and Ancillary Storage Barn at Blotts Barn. Condition 3: b) Written confirmation from Natural England that the application site has been registered with the Great Crested Newt Low Impact Class Licence scheme is submitted. Condition 4: A landscape and ecological management plan (LEMP) is submitted. Condition 8: A written scheme of investigation was agreed with the County Archaeologist and a programme of archaeological work satisfactorily implemented. The associated report, which the County Archaeologist has approved, is provided. Condition 14: Confirmation that the applicant has entered into a S.278 agreement with the Local Highway Authority [to follow]; Condition 18: submission of a Construction Management Plan.
Outside District
Hybrid planning application: Full permission sought for demolition of two dwellings, outbuildings and related structures; creation of access from the A605; highway works to Oundle Road.Junction 17 of the A1(M); and associated site infrastructure works compromising groundworks, internal access roads, strategic landscaping, creation of development plateaus and diversion of underground water pipe. Outline permission sought for the construction of industrial distribution units (use class B8) with ancillary offices (use class e(g)). All matters reserved except for access. Location - Land North Of Peterborough Road Haddon.
Land North Of Old Head Wood Grafton Road Brigstock Northamptonshire
Change of use from agricultural land to solar farm and construction and operation of a solar photovoltaic (PV) development with a capacity of up to 49.9MW with associated infrastructure and landscaping
Priors Hall Site Kirby Lane Deene Northamptonshire NN17 3EJ
Reserved matters approval of (outside of a Key Phase) of access, appearance, landscape, layout and scale, in respect of the construction of: strategic foul water sewer; foul water pumping station; surface water drainage infrastructure and spurs; substation, hard and soft landscaping; a leisure route with areas for future play; landscaped amphitheatre; temporary stockpiling of construction materials; and all ancillary works, associated infrastructure and engineering works (details in cover letter) pursuant to 19/01219/OUT: Application for outline planning permission with all matters reserved except for means of access in relation to the highway access from the A43 and means of access and landscaping in respect of the causeway crossing from Zone 1, for the development of a mixed use urban extension to include; residential development of up to 3,500 dwellings (C3), up to 1,000m2 of A1-A5, D1 and D2 uses within two local centres, up to 1,000m2 of D1/D2 (community building / changing rooms uses), two primary schools (D1), a 0.5 hectare reserve site in Zone 3 for flexible land use (education or informal open space), green infrastructure including formal and informal open space, wildlife corridors, landscaping, allotments / orchards and play areas, primary street and pedestrian and cycle network including diversions to existing PROWs, connections to the surrounding highway , sustainable urban drainage network, utilities and transport infrastructure and any necessary groundworks and demolition, and extension to Local Wildlife Sites
Priors Hall Site Kirby Lane Deene Northamptonshire NN17 3EJ
Reserved matters approval of access, appearance, landscape, layout and scale, in respect of the construction of the KP4 Primary and Secondary street network (details in cover letter) pursuant to application 19/01219/OUT: Application for outline planning permission with all matters reserved except for means of access in relation to the highway access from the A43 and means of access and landscaping in respect of the causeway crossing from Zone 1, for the development of a mixed use urban extension to include; residential development of up to 3,500 dwellings (C3), up to 1,000m2 of A1-A5, D1 and D2 uses within two local centres, up to 1,000m2 of D1/D2 (community building / changing rooms uses), two primary schools (D1), a 0.5 hectare reserve site in Zone 3 for flexible land use (education or informal open space), green infrastructure including formal and informal open space, wildlife corridors, landscaping, allotments / orchards and play areas, primary street and pedestrian and cycle network including diversions to existing PROWs, connections to the surrounding highway , sustainable urban drainage network, utilities and transport infrastructure and any necessary groundworks and demolition, and extension to Local Wildlife Sites