Land North East Of Newbridge Farm Thorne Road East Cowick East Riding Of Yorkshire DN14 8SX
Variation of Condition 2 (removal of log cabin on or before 3 years of decision) and removal of Condition 4 (removal of mobile home within 6 months of decision) of planning permission 18/01835/PLF - Construction of log cabin for a rural worker and erection of an agricultural building with associated yard, track and ancillary development
Land East South West And West Of Tickton Bridge Plantations Main Road Routh East Riding Of Yorkshire HU17 9SL
Construction of solar photovoltaic development including solar panels, installation of sub-station, medium voltage power stations, battery energy storage containers, erection of perimeter fence and CCTV poles with associated access and erection of temporary construction compound
Proposed Substation And Elements South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirement 27 (Stages 2, 4, 5 and 7) (Construction Traffic Management Plan) for the Dogger Bank Creyke Beck B Offshore Wind Farm Development Consent Order 2015 (onshore construction requirements) further to 13/01436/SOS (Revised details to 21/30174/CONDET)
Proposed Substation And Elements South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirement 13 (Onshore Work Plan - Stages 2, 4, 5 and 7), Requirement 22(3) (Watercourse Crossing Methodologies - Stages 2, 4, 5 and 7) and Requirement 23(1) (Construction Environmental Management Plan (CEMP) for Stage 4 for the Dogger Bank Creyke Beck B Offshore Wind Farm Development Consent Order 2015 (onshore construction requirements) further to 13/01436/SOS (revised detail to that approved by 19/30215/CONDET, 19/30332/CONDET, 21/30045/CONDET & 21/30064/CONDET)
Land South West Of Hedon Bypass Hedon East Riding Of Yorkshire HU12 8AA
Hybrid planning application for the development of land at Hedon Haven comprising: 1. An application for full planning permission for the construction of a new estate road between Hull Road (A1033) and Paull Road, together with associated infrastructure and works; and2. An application for outline planning permission for the construction of up to 394,839sqm of employment floorspace (Class B2 (Industrial) / Class B8 (Storage & Distribution)), including ancillary office (Class B1) floorspace, and up to 5,111sqm of flexible commercial floorspace, to include Classes A1-5 (Retail), B1 (Business), C1 (Hotel), D1 (Non-Residential Institutions), D2 (Assembly and Leisure) and other ancillary sui generis uses, and associated landscaping and infrastructure
Catwick Grange Hornsea Road Leven East Riding Of Yorkshire
Construction of holiday park comprising of 55 lodges, reception/amenity building and associated infrastructure (Application to vary Condition 16 (Extraction Equipment) of planning permission 18/04095/STPLF - to enable works for other parts of the development to commence whilst the design of the building is being finalised)
Proposed Substation And Elements South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirements 18 (foul and surface water drainage plan), 21(1) (Ecological Management Plan), 22(1) (Code of Construction Practice), 23 (Construction Environmental Management Plan), 28(1) (European Protected Species) and 32 (Emergency Response Plan) for Stage 6 of the Dogger Bank Creyke Beck Offshore Wind Farm Development Consent Order 2015 (onshore construction requirements) (Project A) further to 13/01436/SOS
Proposed Substation And Elements South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirements 18 (Surface and Foul Water Drainage Plan), 21(1) (Ecological Management Plan), 22(1) (Code of Construction Practice), 23 (Construction Environmental Management Plan (CEMP)), 28(1) (European Protected Species) and 32 (Emergency Response Plan) for Stage 7 for the Dogger Bank Creyke Beck Offshore Wind Farm Development Consent Order 2015 (onshore construction requirements) (Project B) further to 13/01436/SOS
Land South West Of Sands House Farm Cherry Cobb Sands Road Paull East Riding Of Yorkshire HU12 9JX
Discharge of requirement 22 (code of construction practice), 26 (noise management plan), 27 (control of noise) and 28 (emissions management plan) (Schedule 11) of the Able Marine Energy Park Development Consent Order 2014
Proposed Substation And Elements South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirements 11 (Onshore Phasing Plan) (Stages 1, 3, 5 and 6); 13 (Amended Onshore Works Plan) (Stages 1, 3 and 6); 16 (Fencing Plan) (Stages 1, 3, 5 and 6) for Project A only of the Dogger Bank Creyke Beck Offshore Wind Farm Development Consent Order 2015 (onshore construction requirements) 13/01436/SOS further to 19/30267/CONDET