Fairfield Farm Marsh Lane North Cove Beccles Suffolk NR34 7QG
Discharge of Condition 21 of DC/22/3783/FUL - Demolition of existing dwelling and associated outbuilding; erection of replacement dwelling, creation of new access track, tennis court, associated landscaping, hardstanding and boundary treatments - Construction Management Plan submitted.
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No.8 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - surface water drainage verification report
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 17 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Noise validation report
Orwell Logistics Park A14 Nacton East Bound Nacton Heath Ipswich IP10 0DD
Discharge of Condition No. 18 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 20 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)". - details of the areas and enclosures to be provided for the storage of waste and refuse from each unit
38 Hall Farm Road Melton Suffolk IP12 1PJ
Variation of Condition No. 2, 6 and 9 of DC/21/2863/FUL - Proposed erection of 1no. detached bungalow and attached single garage - To enable construction to take place between 08:00 and 13.00 on Saturdays, to detail the change in ground levels of the site and boundary fence and to discharge condition 6 requiring an arboricultural method statement.
The Old Bell Main Road Marlesford Woodbridge Suffolk IP13 0AY
Discharge of Conditions 3 and 4 of DC/22/1207/FUL- (Construction of detached cartlodge, detached outbuilding and new boundary fence/gates) - Materials, Height and Landscaping
Land Off Copland Way Worlingham Beccles Suffolk NR34 7TL
Discharge of Condition No.3 of DC/20/2495/VOC - Variation of Condition 3 on Application DC/14/2634/FUL - Engineering operation to construct a digestate storage lagoon, plus operational development of access road and boundary fencing) and DC/20/2494/VOC (Variation of Condition Nos. 2 and 3 of DC/11/0670/FUL - Construction of an anaerobic digestion plant and associated buildings and structures - in order to regularise the plan and equipment installed on site) - maintenance and management plan for the approved landscaping scheme
Land Opposite The Village Hall To The West Of The B1116 Framlingham Road Dennington Suffolk IP13 8AD
Discharge Of Condition Nos. 4, 5, 9, 10, 13, 17, 19, 20, 21, 22, 23 and 24 of DC/20/5019/FUL - Site a 'Mock-barn' Style Building for Use as a Nursery School and Day Care Facility [Use Class E(f)] for Provision of the Relocation of Badingham Playschool. Landscape, environmental conditions and highways - details of materials, finishes, method of opening, glazing and colour of all new or replacement windows, roof lights and doors and their surrounds, precise details of a scheme of hard landscape works (which shall include boundary treatment (proposed fencing), driveway construction, parking areas, patios, hard surfaces etc, and other operations as appropriate) at a scale not less than 1:200, lighting design strategy for biodiversity, details of the proposed access, visibility splays, details of the equipment, its location, acoustic housing and any vibration isolation measures, together with the projected noise levels at the boundary of the property, site investigation, detailed remediation method statement, RMS approved under condition 20 must be completed in its entirety, validation report, contamination details and Noise Management Plan
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Discharge of Condition 9 for Phase 1 Units 1 and 2 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Construction Surface Water Management Plan.