Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No.8 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - surface water drainage verification report
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 17 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Noise validation report
Orwell Logistics Park A14 Nacton East Bound Nacton Heath Ipswich IP10 0DD
Discharge of Condition No. 18 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 20 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)". - details of the areas and enclosures to be provided for the storage of waste and refuse from each unit
Orwell Logistics Park A14 Nacton East Bound Nacton Suffolk
Non Material Amendment of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Fire track to be formed of compacted gravel, rather than concrete as previously proposed; and Perimeter footpaths to be formed of tarmac, rather than concrete as previously proposed
Former Creek Cabin Reydon Road Blythburgh Halesworth Suffolk IP18 6SH
Construction of a stand-alone shed for the purpose of timber drying and storage of timber, kayaks and garden equipment. The shed is rectangular in plan, 8.0 m by 3.0 m, with a pitched roof, overall height 2.97 m. In the interests of sustainability and economy, it will reuse the roof tiles and A-frames from an old garage elsewhere on the site, due for demolition. The roof is supported on timber columns. The timber columns and timber edging to the roof are painted black. The proposal includes continuing an 800 mm high earth bank along the boundary with the road, topped with a hedge.
Orwell Crossing Service Area A14 Nacton East Bound Nacton Ipswich IP10 0DD
Non Material Amendment of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Number of level access doors reduced from 6no. to 3no; Level access canopy omitted; and Dock door provision increased from 16no. to 23no. Yard depths reduced from 50 metres to 48.1 metres to allow for filter drains to comply with the requirements of the LLFA; Dual northern fence line rationalised, with the omission of the 2.4 metre paladin fence; Transformers now indicated to both units; Rising arm barrier omitted to yard entrance; Yard entrance gates resized and configuration updated to suit fencing contractor; and Additional fence included for security reasons to enclose Wentworth access point
6 Priors Close Lowestoft Suffolk NR32 4NT
Garden room/gym in rear garden, 1m from rear & side boundary. Proposed size = 6.8m wide, 4.8m deep and 3.35m high sloping down to 3.28m at rear (pent). Wooden construction - 6"x2" timber battens to floor & roof, with 4"x2" timber battens to wall uprights, mounted on compacted hard-core base, and concrete slabs and loose shingle for drainage. Insulated walls, plasterboard inside with timber cladding to outsides. One set of uPVC double-glazed double doors with uPVC double-glazed single windows to either side. Rubber roof. Electrics only, no other services.
Land Opposite The Village Hall To The West Of The B1116 Framlingham Road Dennington Suffolk IP13 8AD
Discharge Of Condition Nos. 4, 5, 9, 10, 13, 17, 19, 20, 21, 22, 23 and 24 of DC/20/5019/FUL - Site a 'Mock-barn' Style Building for Use as a Nursery School and Day Care Facility [Use Class E(f)] for Provision of the Relocation of Badingham Playschool. Landscape, environmental conditions and highways - details of materials, finishes, method of opening, glazing and colour of all new or replacement windows, roof lights and doors and their surrounds, precise details of a scheme of hard landscape works (which shall include boundary treatment (proposed fencing), driveway construction, parking areas, patios, hard surfaces etc, and other operations as appropriate) at a scale not less than 1:200, lighting design strategy for biodiversity, details of the proposed access, visibility splays, details of the equipment, its location, acoustic housing and any vibration isolation measures, together with the projected noise levels at the boundary of the property, site investigation, detailed remediation method statement, RMS approved under condition 20 must be completed in its entirety, validation report, contamination details and Noise Management Plan
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Discharge of Condition 9 for Phase 1 Units 1 and 2 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Construction Surface Water Management Plan.