1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
Stanny Priors Hill Road Aldeburgh Suffolk IP15 5EP
Variation of Condition No. 2 of DC/22/1535/FUL - Re-modelling of the rear (SW) elevation, demolition of single storey side extension with roof terrace (2010-11) and small single storey bay and construction of a single storey side extension, over-cladding of walls and refenestration to garage and pool/plant room, and addition of two conservation rooflights at second floor (NW & SE elevations). - Please supersede the following drawings 110 PL1; 111 PL1; 112 PL1; 113 PL1 and 201 PL1 with the revised drawings: 110 PL2; 111 PL2; 112 PL2; 113 PL2 and 201 PL2.
365 Yarmouth Road Lowestoft Suffolk NR32 5DB
Variation of Condition No.2 of DC/21/5751/FUL- Demolition of existing dwelling & detached double garage & construction of 1) a Replacement Dwelling & 2) A Church Hall, associated parking & works & a new vehicular access - To allow for the re-siting of the new detached house to position shown on revised site plan 1395.005B. Include revised site plan - drawing no. 1395.005B (to replace approved drawing no. 1395.005A)
Former Carlton Motors Garage Rushmere Road Carlton Colville Suffolk
Discharge of Condition(s) 12 & 13 of DC/21/2726/VOC - Variation of Condition 2 of DC/20/4921/FUL - Demolition of existing garage buildings and construction of 4 No. detached bungalows with garages, access road and associated hard and soft landscaping - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - 12 - RMS approved under condition 11 must be completed 12 - validation report must be submitted
Former Carlton Motors Rushmere Road Carlton Colville Suffolk NR33 8HA
Discharge of Condition Nos. 12 and 13 of DC/21/2726/VOC - Variation of Condition 2 of DC/20/4921/FUL Demolition of existing garage buildings and construction of 4 No. detached bungalows with garages, access road and associated hard and soft landscaping - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Topsoil Validation Report (Plot 2)
High Broom Cottage Gedgrave Road Gedgrave Suffolk IP12 2BX
Variation of Condition No.2 of DC/22/1087/FUL - Demolition of existing 97sqm 3bed bungalow and construction of 327sqm 4 bedroom bungalow - 1. Garage footprint has been enlarged from 65.95sqm (approved width) to 93.05sqm to house workshop area and larger vehicles. 2. Garage location has been moved and rotated from the approved location further North of the main house and rotated to provide larger turning circle for vehicles. 3. Main corridor internal width has been increased from 1000mm (approved width) to new proposed width of 1500mm 4. Client requirement for Bedroom 2 dressing room has increased external length of bedroom 2 (South elevation) from 7285mm to 9350mm 5. Utility/plant room footprint has been increased to house MVHR, Air source heat pump etc from 6.86sqm (approved area) to 15.08sqm 6. Installation of 12 No solar panels on the garage roof.
Former Carlton Motors Garage Rushmere Road Carlton Colville Suffolk
Discharge of Condition Nos. 12 and 13 of DC/21/2726/VOC - Variation of Condition 2 of DC/20/4921/FUL - Demolition of existing garage buildings and construction of 4 No. detached bungalows with garages, access road and associated hard and soft landscaping - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Topsoil Validation Report (Plot 3) submitted.
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition Nos. 3, 5, 6, 11, 12, 14, 15 and 20 of DC/21/5052/VOC. Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - Condition 3: Schedule of wall and roof materials rev B, Condition 5: Vapour Risk Assessment, Condition 6: Remediation Verification Report, Conditions 11 and 12 : Surface water disposal strategy and maintenance, Condition 14: Construction surface water management plan, Vapour risk assessment, Remediation verification report, Phase 2 contaminated land report and Phase 1 and 2 geo environmental assessment
Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details
Land Off Rushmere Road Carlton Colville Lowestoft
Discharge of Condition Nos. 7, 12 and 13 of DC/21/2726/VOC - Variation of Condition 2 of DC/20/4921/FUL - Demolition of existing garage buildings and construction of 4 No. detached bungalows with garages, access road and associated hard and soft landscaping - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs