Saint Felix School Halesworth Road Reydon Suffolk
Discharge of Condition No. 17 of DC/15/3288/OUT - Outline Application to enable improvements to Saint Felix School to include residential development, public open space and associated infrastructure on the former playing field at Saint Felix School - Construction Environmental Management Plan
Sizewell C And Associated Development Sites Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Site Waste Management Plan) of the Sizewell C Development Consent Order
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Site Wide Material Management Plan) of the Sizewell C Development Consent Order.
Sizewell C And Associated Development Sites Suffolk
Discharge of Requirement 2 (Code of Construction Practice -Dust Management Plan for site establishment early access road, Soil Management Plan for site establishment early access road) of Sizewell C Development Consent Order
The Old Market Garage 10A Old Market Beccles Suffolk NR34 9AP
Redevelopment of garage premises to 3no residential units and 1no commercial unit. This application is submitted for a revised proposal to that of DC/20/0118/FUL which has commenced, and the alterations are limited to; 1. Amending the extend and areas of re-building due to the condition and construction of the existing building, which was not visible until commencement of the project. 2. Increasing the garden area provided to the development as an additional area of land was located behind an existing retaining wall adjacent 10 Old Market. 3. The creation of a parking space to support the development for unloading and loading to the commercial unit in the position of the previous garage, due to the complexity of accessing the building which has partially come to light during the construction process. 4. Additional details on the previously unseen and hidden ground levels, including retaining walls as appropriate. 5. Phasing of the project to ensure funds can be directed to demolition of the unsound areas, removal of underground fuel tanks, ground remediation and reconstruction of the front section of the development facing Old Market.
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
Land Rear Of 15 St Peters Close Charsfield Suffolk
Discharge of Condition Nos. 9 and 10 of DC/22/1654/FUL - Construction of access road, drainage and services to serve future housing development- Archaeological Assessment - Site Investigation.
Associated British Ports Port Of Lowestoft Lowestoft Suffolk
Discharge of Condition Nos. 6 of DC/23/2039/FUL - Development of a temporary heat driven Direct Air Capture Demonstrator Plant, comprising a 45m air coloumn and associated mobile office, welfare storage cabin and control room - Construction Management Strategy
Benhall Fen Meadow Works Aldecar Lane Benhall Suffolk
Discharge of Requirement 2 - Bespoke Mitigation Plan for Benhall Fen Meadow works, secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
Land East Of B1077 Mow Hill Witnesham Ipswich Suffolk IP6 9EH
Discharge of Condition Nos. 18 and 19 of DC/22/0998/FUL - Residential development of 32 dwellings, together with areas of new public open space and the provision of a new access to the site from the B1077 - Construction Method Strategy and Construction Management Plan.