Saint Felix School Halesworth Road Reydon Suffolk
Discharge of Condition No. 17 of DC/15/3288/OUT - Outline Application to enable improvements to Saint Felix School to include residential development, public open space and associated infrastructure on the former playing field at Saint Felix School - Construction Environmental Management Plan
365 Yarmouth Road Lowestoft Suffolk NR32 5DB
Discharge of Condition No. 5 of DC/23/2848/VOC - Demolition of existing dwelling & detached double garage & construction of 1) a Replacement Dwelling & 2) A Church Hall, associated parking & works & a new vehicular access - design details relating to the required improvements to the entrance
115 Bucklesham Road Purdis Farm Ipswich Suffolk IP3 8TX
Discharge of Condition No. 5 of DC/23/1300/FUL - Replacement dwelling - Construction & Deliveries Management Plan
Sizewell C And Associated Development Sites Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Site Waste Management Plan) of the Sizewell C Development Consent Order
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Site Wide Material Management Plan) of the Sizewell C Development Consent Order.
6 Dukes Meadow Woodbridge Suffolk IP12 4DR
Discharge of Condition Nos. 13 and 14 of DC/21/4984/FUL - Demolition of existing dwelling. Erection of two storey dwelling with detached garage. New vehicle access to highway (as previously approved under extant permission). Associated landscaping - details of a scheme of landscape works and detailed method of construction statement
Sizewell C And Associated Development Sites Suffolk
Discharge of Requirement 2 (Code of Construction Practice -Dust Management Plan for site establishment early access road, Soil Management Plan for site establishment early access road) of Sizewell C Development Consent Order
Pinetrees Purdis Farm Lane Purdis Farm Ipswich Suffolk IP3 8UF
Discharge of Condition(s): 3 (materials); 4 (arboricultural impact/method statement); 6 (construction method statement); 17 (construction surface water management plan); 20 (preliminary ecological appraisal) of DC/22/2437/FUL.
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of Condition No.27 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south - The height and position of the ball stop netting/fencing to the grass pitch.