Land South Of 7 Chantry Close Campsea Ashe Suffolk
Non-Material Amendment of DC/22/4955/VOC - Variation of Condition No. 2 of C90/0842 - Erection of eight two-storey dwellings off private drives together with construction of vehicular access (Revised Scheme) - Drawing references to replace drawing 1/13 with PW1206_PL11A and include drawings PW1206_PL10A and PL12 - Proposed Block Plan submitted and details of change of bricks to TBS 65mm Maubray Bricks. Change of Roof tiles to Sandtoft Shire Pantiles (Terracotta). Change of UPVC Window colour from grey to white.
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No.8 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - surface water drainage verification report
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 17 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Noise validation report
Orwell Logistics Park A14 Nacton East Bound Nacton Heath Ipswich IP10 0DD
Discharge of Condition No. 18 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 20 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)". - details of the areas and enclosures to be provided for the storage of waste and refuse from each unit
Orwell Logistics Park A14 Nacton East Bound Nacton Suffolk
Non Material Amendment of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Fire track to be formed of compacted gravel, rather than concrete as previously proposed; and Perimeter footpaths to be formed of tarmac, rather than concrete as previously proposed
The Volunteer Inn Haylings Road Leiston Suffolk IP16 4DJ
Discharge of Condition Nos. 7 and 8 of DC/22/0739/FUL - For C3 residential use comprising conversion of the former public house to 2x 1-bedroom apartments and 1x 2-bedroom apartment, together with the erection of 2x 1-bed semi-detached, 2 storey new homes and associated works including demolition of the storage buildings to the rear of the public house - Construction Method Statement and details of the roof, wall materials and finishes
Goldsmiths Farm Ashbocking Road Otley Ipswich Suffolk IP6 9JS
Non Material Amendment of DC/21/0715/FUL - Erection of two storey room in roof rear extension. Replacement of cart lodge with annex cart lodge. (Resubmission relating to extant approved application DC/20/3897/FUL to propose minor amendments to cartlodge structure). - We wish to commence construction and identified that an LV Cables which supplies electricity to my neighbour (goldsmiths barn) goes through the garage. In order to resolve the clash we would like to slightly move the cart lodge back by 3-4m.
Orwell Crossing Service Area A14 Nacton East Bound Nacton Ipswich IP10 0DD
Non Material Amendment of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Number of level access doors reduced from 6no. to 3no; Level access canopy omitted; and Dock door provision increased from 16no. to 23no. Yard depths reduced from 50 metres to 48.1 metres to allow for filter drains to comply with the requirements of the LLFA; Dual northern fence line rationalised, with the omission of the 2.4 metre paladin fence; Transformers now indicated to both units; Rising arm barrier omitted to yard entrance; Yard entrance gates resized and configuration updated to suit fencing contractor; and Additional fence included for security reasons to enclose Wentworth access point
2 Pilgrims Way Thorpeness Aldringham Cum Thorpe Suffolk IP16 4LZ
Construction of new front porch; addition of new pitched roof in lieu of existing flat roof; demolition of part of existing outbuilding and covered way and construction of new two storey extension; demolition of existing garage and erection of new garage and creation of adjacent parking space with ev charger