Greenside Farm The Green South Elmham St Margaret Harleston Suffolk IP20 0PR
Non Material Amendment to DC/21/3773/FUL - Conversion of timber frame barn to single dwellinghouse with associated parking & landscaping. Installation of sewage treatment plant. Erection of 3 bay cartlodge. (Reapplication for previously granted permission now expired) - Use of black clay pantiles instead of the natural red clay pantiles already permitted.
Low Barn Meadows Wood Road Badingham Suffolk
Non Material Amendment of DC/22/2804/FUL - Erection of off-grid dwelling along with landscape works to create a residential curtilage including sewage treatment plant and wetland ponds, erection of a garage with photovoltaic array, borehole, demolition of existing 1970's asbestos clad outbuilding and use of existing cattle sheds for combined use in association with dwelling and adjoining land. - use galvanised box profile metal sheet on the roofs of the new garage and brick 1950's cattle shed
Bank House 177 High Street Aldeburgh Suffolk IP15 5AN
Non Material Amendment of DC/18/4866/FUL - Demolition of existing outbuilding & garage. Erection of new dwelling (comprising basement and room-in-roof levels) with integral parking and widened vehicle access crossover at land to rear of Barclays Bank, 177 High Street, Aldeburgh - Retention of existing bank vault to 177 High Street - Landscaping amended - North boundary wall to be reinstated
Orwell Logistics Park A14 Nacton East Bound Nacton Suffolk
Non Material Amendment of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Fire track to be formed of compacted gravel, rather than concrete as previously proposed; and Perimeter footpaths to be formed of tarmac, rather than concrete as previously proposed
Land South Of No. 34 The Street Hacheston Woodbridge IP13 0DR
Non Material Amendment of DC/21/2847/VOC - Variation of condition 1 on application DC/19/3728/ARM Approval of reserved matters of DC/16/3863/OUT; use of land fore the erection of 10 dwellings with associated garaging / parking. Construction of access road. Complete design, including details for access, appearance, landscaping, layout and scale; details are contained within the accompanying documents. The Outline application was not an environmental impact assessment - Revisions to site fencing strategy as set out on attached drawing, and described within attached statement
Orwell Crossing Service Area A14 Nacton East Bound Nacton Ipswich IP10 0DD
Non Material Amendment of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Number of level access doors reduced from 6no. to 3no; Level access canopy omitted; and Dock door provision increased from 16no. to 23no. Yard depths reduced from 50 metres to 48.1 metres to allow for filter drains to comply with the requirements of the LLFA; Dual northern fence line rationalised, with the omission of the 2.4 metre paladin fence; Transformers now indicated to both units; Rising arm barrier omitted to yard entrance; Yard entrance gates resized and configuration updated to suit fencing contractor; and Additional fence included for security reasons to enclose Wentworth access point
Part Land North Of Hill Farm High Street Ufford Suffolk IP13 6EG
Non Material Amendment of DC/21/0466/VOC - Erection of 7 X single storey bungalow dwellings - all matters: access, appearance, landscaping, layout, scale - 1. Photovoltaic panels have been added to one roof plane ( South facing) of all dwellings 2 Height of ridges have been raised by approx 250mm - previous heights indicated by dashed red lines on elevations 3 Extent of gravel paths and paving in front of dwellings has been slightly modified 4 Willow fence panels have been replaced by timber post and rail fencing along curved front garden of Unit 2 5 A covered carport has been eliminated from the rear of Units 4 and 5, a brick party wall replaces it; all car parking spaces are retained
Land South Of No.34 The Street Hacheston Woodbridge Suffolk IP13 0DR
Non Material Amendment of DC/21/2847/VOC - Variation of condition 1 on application DC/19/3728/ARM Approval of reserved matters of DC/16/3863/OUT; use of land fore the erection of 10 dwellings with associated garaging/parking. Construction of access road. Complete design, including details for access, appearance, landscaping, layout and scale; details are contained within the accompanying documents. The outline application was not an environmental impact assessment. - To plots 7 & 8, to provide weatherboarding within the front and rear gables of the two storey elements. To the front the weatherboarding will start above the level of the brick soldier course over the first floor windows, whilst to the rear the weatherboarding will start at first floor window head level. The weatherboarding will match that used to the central link walls and dormer
Land South Of No.34 The Street Hacheston Woodbridge Suffolk IP13 0DR
Non Material Amendment of DC/21/2847/VOC - Variation of Condition(s) 1 on application DC/19/3728/ARM - Approval of Reserved Matters of DC/16/3863/OUT - Use of land for the erection of 10 dwellings with associated garaging/parking. Construction of access road. - Complete design, including details for access, appearance, landscaping, layout and scale - details are contained within the accompanying documents. The outline application was not an environment impact assessment. - amendments to windows within Plots 5, 6 and 10. Minor amendment to internal layout of Plot 10
Sizewell B Power Station Complex And Adjoining Land Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4UR
Non Material Amendment DC/19/1637/FUL - 1. In outline, comprising a Visitor Centre (maximum 2,000sq.m GEA) and a maximum of 9,500sq.m (GEA) of floorspace to provide administration, storage, welfare and canteen facilities with all matters reserved apart from access. 2. In full, for the demolition of the existing Outage Store, Laydown Area, Operations Training Centre, Technical Training Facility, Visitor Centre, and Rosery Cottage garage; removal of technical training and pool car park (63 spaces), Coronation Wood car park (21 spaces), Visitor Centre car park (16 spaces) and northern outage car park (576 spaces); meantime use of the Technical Training Centre as an interim Visitor Centre followed by its demolition; and erection of new (all floorspace in GEA) Outage Store (2,778sq.m), Laydown Area (11,990sq.m) including New Western Access Road, Yardman's Office (23sq.m), Training Centre (4,032sq.m), Rosery Cottage garage (30sq.m), Replacement Car Park (2,363sq.m) providing 112 spaces, and Outage Car Park (15,525sq.m) providing (576 spaces) including new access road (and alternative access to bridleway), footpath and amended junction at Sizewell Gap; and associated landscaping earthworks/recontouring, tree felling and boundary treatment.