6 Dukes Meadow Woodbridge Suffolk IP12 4DR
Discharge of Condition Nos. 13 and 14 of DC/21/4984/FUL - Demolition of existing dwelling. Erection of two storey dwelling with detached garage. New vehicle access to highway (as previously approved under extant permission). Associated landscaping - details of a scheme of landscape works and detailed method of construction statement
Land At The Rear Of St Margarets Crescent Leiston Suffolk
Discharge of Condition No. 5, 6 & 11 of DC/21/1548/ARM - Approval of Reserved Matters of DC/16/2104/OUT - Erection of 77 dwellings with associated access, infrastructure, landscaping and amenity space - Conditions 5 and 6 Construction Traffic Management Plan Phasing Arrangements (CTMP) and Condition 11 Construction Surface Water Management Plan (CSWMP)
Land To The South Side Of Levington Lane Bucklesham Suffolk
Discharge of Condition No. 22 of DC/19/4510/OUT - The erection of up to 33 dwellings with associated landscaping, vehicular access and parking provision. All matters reserved aside from access - Construction Method Statement and Construction Environmental Management Plan
Fairfield Farm Marsh Lane North Cove Beccles Suffolk NR34 7QG
Discharge of Condition 21 of DC/22/3783/FUL - Demolition of existing dwelling and associated outbuilding; erection of replacement dwelling, creation of new access track, tennis court, associated landscaping, hardstanding and boundary treatments - Construction Management Plan submitted.
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No.8 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - surface water drainage verification report
Elm Tree Farm Charsfield Road Hoo Woodbridge Suffolk IP13 7QS
Discharge of Condition No. 5 of DC/22/4706/VOC - Variation of condition 2 of application DC/21/4309/FUL - (Rear extension to the listed dwelling linking to existing outbuilding. Change of use of land to enlarge the residential curtilage to include the erection of a detached garage/cartlodge. Renovations to an existing barn on land to the north-west of the dwelling) - Materials (Dutch Barn and Garage), Eaves and Ridge Heights, Details, Fenestration Details, Method Statement for construction of the basement extension, Schedule of repairs to the farmhouse, Details of the proposed front door provided.
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 17 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Noise validation report
Orwell Logistics Park A14 Nacton East Bound Nacton Heath Ipswich IP10 0DD
Discharge of Condition No. 18 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".
Land To South Of Railway Line Westerfield Road Ipswich Suffolk
Consultation IP/22/00459/FUL - Construction of one Vehicular Bridge and one Pedestrian & Cycle Bridge to be built over the existing railway line, works to include: drainage; earthworks; ancillary works; erection of boundary fencing; provision of temporary haul roads; provision of temporary construction compounds; and use / provision of construction accesses from Henley Road and Westerfield Road.
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 20 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)". - details of the areas and enclosures to be provided for the storage of waste and refuse from each unit