Land Adjacent To 19 Union Lane Oulton Suffolk
Approval of Reserved Matters of DC/19/2422/OUT - Outline Application (with all matters reserved) Construction of 2 Detached Dwellings together with associated garages - See Dwg No 2022/102//09 Proposed Boundary Treatment Plan (proposed Site Layout Plan )(Scale 1:200) referencing : Access, Layout, Scale, Appearance, Landscaping, Water Use -efficiency, Energy Consumption and Waste Recycling
Land To The South And East Of Adastral Park
Approval of reserved matters - the construction of 119 dwellings (including 34 affordable houses), associated works, landscaping and infrastructure for Phase E1, together with details of Green Infrastructure relating to the adjoining part of the southern boundary (Ipswich Road) SANG - on DC/20/1234/VOC.
Land South And East Of Adastral Park Martlesham Heath Martlesham Suffolk
Approval of reserved matters - site entrance and boulevard comprising the detail of the following elements: the new junction with the A12; the entrance to the site, including the new entrance feature / acoustic bund along the A12 boundary; the new boulevard from the site entrance to the junction with the eastern spine road; the new western spine road and new junction with the Ipswich Road, incorporating measures required by Condition 43 of DC/17/1435/OUT; the landscaping to the entrance and zone along the boulevard / spine road; the new drainage to the boulevard and spine road, including pumping station off the Ipswich Road, in the valley corridor; the new incoming utility supplies along the route of the boulevard and spine road - on DC/20/1234/VOC.
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".