Olive Terrace Newgate Beccles Suffolk NR34 9SR
Discharge of conditions 15 on DC/21/1547/VOC - (Variation of Condition No.11 of DC/20/0117/FUL - (Demolition of existing building and replacement with 3no terraced dwellings) - Condition No 11 - Part 2 - Works to the north boundary wall of the existing building once the roof is removed to include any re-rendering internally on the south side and any coping and creasing to the top to be submitted, determined and completed all in accordance with the approved works prior to occupation.)
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No.8 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - surface water drainage verification report
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 17 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting) - Noise validation report
Orwell Logistics Park A14 Nacton East Bound Nacton Heath Ipswich IP10 0DD
Discharge of Condition No. 18 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)".
Site At Orwell Crossing Service A14 Nacton East Bound Nacton Suffolk
Discharge of Condition No. 20 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)". - details of the areas and enclosures to be provided for the storage of waste and refuse from each unit
Land Opposite The Village Hall To The West Of The B1116 Framlingham Road Dennington Suffolk IP13 8AD
Discharge Of Condition Nos. 4, 5, 9, 10, 13, 17, 19, 20, 21, 22, 23 and 24 of DC/20/5019/FUL - Site a 'Mock-barn' Style Building for Use as a Nursery School and Day Care Facility [Use Class E(f)] for Provision of the Relocation of Badingham Playschool. Landscape, environmental conditions and highways - details of materials, finishes, method of opening, glazing and colour of all new or replacement windows, roof lights and doors and their surrounds, precise details of a scheme of hard landscape works (which shall include boundary treatment (proposed fencing), driveway construction, parking areas, patios, hard surfaces etc, and other operations as appropriate) at a scale not less than 1:200, lighting design strategy for biodiversity, details of the proposed access, visibility splays, details of the equipment, its location, acoustic housing and any vibration isolation measures, together with the projected noise levels at the boundary of the property, site investigation, detailed remediation method statement, RMS approved under condition 20 must be completed in its entirety, validation report, contamination details and Noise Management Plan
69 Thoroughfare Woodbridge Suffolk IP12 1AH
Discharge of Condition No. 4 of DC/21/3074/LBC - Listed Building Consent - Change of use from Commercial Offices to retail and residential with new timber framed single storey extension to replace existing rear extension - 1. Details of all external materials including timber cladding, roof finishes, render (including colour); 2. Typical horizontal and vertical sections through shopfront, doors and windows (including large scale joinery details for frames, cills, opening lights, glazing bars) along with method of opening, position within wall opening, colour, finish and ironmongery. 3. Details of rooflights and sliding doors; 4. Full schedule of repairs; 5. Details of rainwater pipes, gutters, SVPs, external flues, vents and grilles (including location, colour and finish); 6. Details of all external works, boundary fencing and gate.
Stables And Manege Mill Road Badingham IP13 8LF
Discharge of Conditions 3 & 11 of DC/20/4106/FUL - Demolition of stable building and removal of boundary hedge. Erection of three new detached dwellings with new shared vehicular access from Mill Road - Cond. 3 - Details of facing and roofing materials. Cond. 11 - Landscape management plan. Cond. 11 - Detailed planting plan
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Discharge of Condition 9 for Phase 1 Units 1 and 2 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Construction Surface Water Management Plan.
Orwell Crossing Service Area A14 Nacton East Bound Nacton Suffolk
Discharge of Conditions 6 and 7 for Phase 1 Units 1 and 2 of DC/21/1575/ARM - Reserved Matters approval sought for details of access, appearance, layout, landscaping and scale pursuant to condition 1 of outline planning permission ref. DC/17/4257/OUT dated 28th June 2018 comprising the erection of 4 no. warehouse buildings with associated parking and servicing arrangements, along with details submitted pursuant to conditions nos. 7 (phasing management plan), 9 (construction management plan), 10 (site wide masterplan document), 14 (parameter plan), 18 (link road), 8 (surface water management strategy), 11 (external facing and roofing materials), 12 (roads and footways), 13 (electric vehicle charging points), 16 (boundary and boundary enhancements), 17 (noise attenuation measures, 4 (framework travel plan) and 5 (external lighting)" - Strategy for disposal of surface water and details of implementation, maintenance and management.