The Volunteer Inn Haylings Road Leiston Suffolk IP16 4DJ
Discharge of Condition Nos. 7 and 8 of DC/22/0739/FUL - For C3 residential use comprising conversion of the former public house to 2x 1-bedroom apartments and 1x 2-bedroom apartment, together with the erection of 2x 1-bed semi-detached, 2 storey new homes and associated works including demolition of the storage buildings to the rear of the public house - Construction Method Statement and details of the roof, wall materials and finishes
2 Pilgrims Way Thorpeness Aldringham Cum Thorpe Suffolk IP16 4LZ
Construction of new front porch; addition of new pitched roof in lieu of existing flat roof; demolition of part of existing outbuilding and covered way and construction of new two storey extension; demolition of existing garage and erection of new garage and creation of adjacent parking space with ev charger
Land And Buildings North Of 78 High Street Wickham Market Suffolk IP13 0QU
Non Material Amendment of DC/20/3586/FUL - Conversion of former coach house, including large element of demolition and rebuilding, together with erection of single-storey side extension and construction of new access drive to form single dwelling. Relocation of PV panels from the roof slope of the main dwelling to the ground in the location indicated on the site plan provided
Bank House 177 High Street Aldeburgh Suffolk IP15 5AN
Discharge of Condition Nos. 3, 6 and 7 of DC/18/4866/FUL - Demolition of existing outbuilding & garage. Erection of new dwelling (comprising basement and room-in-roof levels) with integral parking and widened vehicle access crossover at land to rear of Barclays Bank, 177 High Street, Aldeburgh - details of the roof, wall materials and finishes, Arboricultural Method Statement and Construction Method Statement
Land Adjacent 16 Fawcett Road Aldeburgh Suffolk
Discharge of Condition Nos. 3 and 6 of DC/18/5075/FUL - The erection of one dwelling with associated parking and landscaping, alongside the part demolition of 16 Fawcett Road - details of the roof, wall materials and finishes and Construction Method Statement