Goldsmiths Farm Ashbocking Road Otley Ipswich Suffolk IP6 9JS
Non Material Amendment of DC/21/0715/FUL - Erection of two storey room in roof rear extension. Replacement of cart lodge with annex cart lodge. (Resubmission relating to extant approved application DC/20/3897/FUL to propose minor amendments to cartlodge structure). - We wish to commence construction and identified that an LV Cables which supplies electricity to my neighbour (goldsmiths barn) goes through the garage. In order to resolve the clash we would like to slightly move the cart lodge back by 3-4m.
2 Pilgrims Way Thorpeness Aldringham Cum Thorpe Suffolk IP16 4LZ
Construction of new front porch; addition of new pitched roof in lieu of existing flat roof; demolition of part of existing outbuilding and covered way and construction of new two storey extension; demolition of existing garage and erection of new garage and creation of adjacent parking space with ev charger
Kelsyth Red Lane Sternfield Suffolk IP17 1HS
Discharge of Condition Nos. 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14 and 15 of DC/16/3076/OUT - Erection of single storey dwelling and garage including all ancillary works on surplus amenity land serving Kelsyth, Red Lane, Sternfield - Condition 3) Construction Management Scheme - Attached 'CMP Sternfield' Condition 4, 5, 6, 7 & 9) - These conditions we agree. The surface water management will be by Soak away to the rear and front of the site attachment 'Soakaways' fitted in accordance with Building control regulations, with Aco drains running parallel to the curbed driveway entrance connected to the soakaways preventing the discharge of surface water onto the highways. The drive way material will be Block paved to not impact the road from any debris spilling onto it ie shingle Attachment 'Driveway' the verges will be laid to lawn. Condition 8) - The bin stores are highlighted on the 'Attachment 2 Bins' Condition 10) - Agreed - Sufficient parking will be provided for off street parking for 2 cars. Condition 11) - Visual splays will be provided for accessing the development at road level. Condition 12, 13, 14 & 15) - Ground Contamination Report - We will now instruct a full survey and forward on once completed. Additional information requested Retaining wall - We have appointed 'Team Elite' to supply and fit Steel King posts black 3.6M long with 75mm thick / 230mm high individual sleepers 'Attachment Retaining Wall' Exterior materials - The roof will be grey effect concrete tiles Attached 'Grey Roof tile' the bricks will be red antique brick in keeping with surrounding properties 'Attachment 5 Brick'
Bank House 177 High Street Aldeburgh Suffolk IP15 5AN
Discharge of Condition Nos. 3, 6 and 7 of DC/18/4866/FUL - Demolition of existing outbuilding & garage. Erection of new dwelling (comprising basement and room-in-roof levels) with integral parking and widened vehicle access crossover at land to rear of Barclays Bank, 177 High Street, Aldeburgh - details of the roof, wall materials and finishes, Arboricultural Method Statement and Construction Method Statement